Activity Search: TC-RES-0325-01617
Activity
Parcel Attributes
| Parcel | 113072790 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Hedrick Acres |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 11/17/2026 1:04 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0325-01617 | Inspections | 03/27/2025 | 08/17/2027 | UNIT 1 | Residential Building - One or Two Family | Bedroom Suite Addition REV1_1. Roof Structure Revision The previously approved plan set utilized pre-fabricated trusses (see approved Roof Plan). The revised submittal replaces the truss system with a conventional wood-framed rafter system. - Rafters are clearly indicated on the Roof / Framing Plan (Sheet A104) - Roof slope, spacing, and structural members have been updated accordingly - All related framing details have been revised to reflect this system 2. Beam and Post Structural Support Due to the change from trusses to rafters, a beam and post support system has been introduced. - Beam support is provided along the wall lines to carry roof loads - Posts transfer loads to the foundation - Structural connections are shown in the updated details Refer to: - Foundation Plan – Detail 2 (Post Column Footing) - Roof Plan / Framing Details – Sheet A104 (Beam + Rafter Connections) 3. Coordination with Structural and Foundation Elements All affected sheets have been coordinated to reflect the revised system, including: - Foundation Plan (updated for post supports) - Roof / Framing Plan (rafters in lieu of trusses) - Structural details and connections 4. Clarification This revision is a design change from truss system to rafter framing, not an omission. All required structural elements and load paths are fully detailed within the submitted plans. |