Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
01/05/2024
Applicant:
Terry Darr
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0124-00101
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
04/29/2024 RESTAMP - RESIDENTIAL v.1 05/01/2024 APPROVED Review Details
01/05/2024 RESIDENTIAL NEW DWELLING v.1 02/01/2024 REQUIRES RESUBMIT Review Details
07/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2024 APPROVED Review Details
04/05/2024 RESIDENTIAL NEW DWELLING v.2 04/29/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0124-00101
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date Name
04/21/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-RES-0124-00101
Permit Status: Issued
Permit Description: SFR
Date Description Comments
04/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0124-00101
Permite Description: SFR
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/31/2024 COT - RSBU - Roof Nailing N/A Not Ready Not ready no extension ladder on site
07/31/2024 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready Not ready hold down is not in place stopped inspection
02/19/2025 BULD - Electrical Clearance N/A Re-inspection required 2/19/25: Grey water not installed per plans, properly support gas lines in wall at garage, DWV not under test, support pex lines at laundry in wall for laundry box, nail plates required where electrical or plumbing comes within 1 1/4" of face of stud, supply air missing in laundry room, supply air missing in hall way, secure pex at hose bib, nail plate required at kitchen hood duct, fire place vent not installed, gas piping not complete, seal all penetrations at top plate throughout, copper pipe that will be in contact with stucco must be wrapped with 10mil tape for uv protection. STOPPED INSPECTION WILL BE RECALLED WHEN COMPLETED.
02/19/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 2/19/25: Grey water not installed per plans, properly support gas lines in wall at garage, DWV not under test, support pex lines at laundry in wall for laundry box, nail plates required where electrical or plumbing comes within 1 1/4" of face of stud, supply air missing in laundry room, supply air missing in hall way, secure pex at hose bib, nail plate required at kitchen hood duct, fire place vent not installed, gas piping not complete, seal all penetrations at top plate throughout, copper pipe that will be in contact with stucco must be wrapped with 10mil tape for uv protection. STOPPED INSPECTION WILL BE RECALLED WHEN COMPLETED.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0124-00101
Permit Description: SFR
Total Completed Inspections - 10
Date Description Inspector Results Comments
05/17/2024 COT - RSPL - Rough Soil Passed 5/17/24: plumbing underground per plans ok to backfill. Shading required
06/05/2024 COT - RSBU - Preslab Passed 6/5/24: reinforcement per schedule ok to proceed.
06/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 6/5/24: reinforcement per schedule ok to proceed.
07/05/2024 COT - RSPL - Sewer Passed 7/5/24: sewer connection made. Ok to backfill. Shading required
08/02/2024 COT - RSBU - Roof Nailing Passed Not ready no extension ladder on site
8/2/24: roof nailing passed ok to dry-in
08/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed Ok to,cover exterior walls
12/20/2024 COT - RSPL - Yard Water Line Passed 12/20/24 pass ok to backfill, shading required.
02/25/2025 COT - RSPL - Gas Pressure Test Passed 2/25/25 Corrections made held pressure
02/25/2025 BULD - Electrical Clearance Passed 2/25/25 Corrections made CLEARANCE ECO ready for temp power
02/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/25/25 corrections made

Documents

File Name Document Type  
TC-RES-0124-00101-M1_V1.PDF DOCUMENTS VIEW
TC-RES-0124-00101-TRUSSES_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TC-RES-0124-00101-D2_V1.PDF DOCUMENTS VIEW
TC-RES-0124-00101-D2_V1.PDF DOCUMENTS VIEW
TC-RES-0124-00101-SC_V1.PDF DOCUMENTS VIEW
TC-RES-0124-00101-SR_V1.PDF DOCUMENTS VIEW