Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Permit Number - TC-RES-0124-00101

Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Inspection Status - Not Ready

Date Description Inspector Results Comments
07/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Not Ready Not ready hold down is not in place stopped inspection
08/16/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required Not ready hold down is not in place stopped inspection
8/16/24: Hold downs missing throughout and not placed in correct location, Anchor bolt spacing at exterior wall and interior bearing walls not per plan, hangers missing throughout, (3) 2X12 header missing at bathroom per plan, properly fasten all hangers and clips throughout, provide truss clacs.
08/30/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to,cover exterior walls