Permit: TC-RES-0123-02297
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3504 E CALLE DEL PRADO UNIT 2
Address NEW:
3504 E CALLE DEL PRADO UNIT 2
Apply Date:
01/23/2023
Applicant:
Angela Flores
Description:
ADU Casita
Permit Reviews
Permit Number - TC-RES-0123-02297
Permit Status: Complete
Permit Description: ADU Casita
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2024 | RESIDENTIAL ADU v.1 | 05/30/2024 | APPROVED |
| 08/03/2023 | RESIDENTIAL NEW DWELLING v.3 | 08/03/2023 | REQUIRES RESUBMIT |
| 08/18/2023 | RESIDENTIAL NEW DWELLING v.5 | 08/18/2023 | APPROVED |
| 12/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/02/2024 | REQUIRES RESUBMIT |
| 02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/23/2023 | REQUIRES RESUBMIT |
| 08/18/2023 | RESTAMP - RESIDENTIAL v.1 | 08/21/2023 | APPROVED |
| 06/13/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/04/2023 | REQUIRES RESUBMIT |
| 08/17/2023 | RESIDENTIAL NEW DWELLING v.4 | 08/17/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0123-02297
Permit Status: Complete
Permit Description: ADU Casita
| Date | Description | Comments |
|---|---|---|
| 07/03/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
| 08/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02297
Permite Description: ADU Casita
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-No test on piping. 2-San-tees can not be used horizontally. 3-register boxes need blocking on three sides. 4-Ceiling fan in bdrm 2 is not complete. 5-Secure water piping exiting walls. |
| 02/22/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | |
| 06/10/2025 | COT - RSEL - Electrical Final | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02297
Permit Description: ADU Casita
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2024 | COT - RSPL - Sewer | Passed | ||
| 02/21/2024 | COT - RSBU - Preslab | Passed | Forms are set, footing is dug, and rebar reinforcement is in place. Subsoil is compacted. Okay to pour concrete. | |
| 04/02/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/22/24: Loose shear panels have been properly nailed off, bolts have been drilled into plate and floor on bottom plate, cut nails have been added to bottom plate on interior walls and fire blocking is installed at 8' height in all walls. | |
| 06/05/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. Unit #2. 6/5/2024 | |
| 08/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock walls throughout. | |
| 05/23/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/09/2025 | RSBU - Building Final | Passed | ||
| 06/09/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/09/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/09/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 06/10/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/10/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/10/2025 | COT - RSPL - Rough Soil | Passed | ||
| 06/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed |