Permit: TC-RES-0123-02215
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2432 E MABEL ST
Address NEW:
2432 E MABEL ST
Apply Date:
01/18/2023
Applicant:
Anthony Vidal
Description:
Kitchen; Bedroom and Garage Addition
Permit Reviews
Permit Number - TC-RES-0123-02215
Permit Status: Issued
Permit Description: Kitchen; Bedroom and Garage Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2023 | RESIDENTIAL NEW DWELLING v.2 | 04/05/2023 | APPROVED |
| 06/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/06/2023 | APPROVED |
| 04/05/2023 | RESTAMP - RESIDENTIAL v.1 | 04/06/2023 | APPROVED |
| 01/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0123-02215
Permit Status: Issued
Permit Description: Kitchen; Bedroom and Garage Addition
| Date | Description | Comments |
|---|---|---|
| 04/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0123-02215
Permite Description: Kitchen; Bedroom and Garage Addition
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2023 | COT - RSPL - Gas Pressure Test | N/A | Partial Pass | Partial pass. 14' of gas line under pressure from meter to the back of the home. Okay to backfill. 5/8/2023 |
| 07/10/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 7-10-23: No plans nor ladder. |
| 07/10/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 7-10-23: No plans nor ladder. |
| 08/15/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 8/15/23: provide new plans and a electric page, UF cable required in conduit under slab, open up 1 side of bathroom walls for inspection, provide minimum 30" of platform on the working side of air handler, provide attic access in bedroom to air handler and reroute all duct in the way, ground all metal boxes, move smoke det 3 feet from register, seal all gaps at top of wall against the existing brick, incorrect nail plates at top & bottom plates to protect ABS. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0123-02215
Permit Description: Kitchen; Bedroom and Garage Addition
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. 5/18/2023 | |
| 05/26/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete placement in slab and footings. Rebar per plan. 5/26/2023 | |
| 07/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/12/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/16/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/16/23: All items above have been corrected by the contractor. Okay to insulate, drywall, and texture walls. | |
| 11/13/2023 | RSBU - Building Final | Passed |