Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7382 S DEMPSEY AV
Apply Date:
12/20/2024
Applicant:
Celina Rodriguez
Description:
KB Home 1768 (Model Master Plan TC-MDP-1124-01303)

Permit Reviews

Permit Number - TC-MDP-1224-01404
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Start Date Submittal Complete Date Status  
02/12/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/25/2025 REQUIRES RESUBMIT Review Details
02/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/27/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01404
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Activity Conditions - 5
Date Name
02/14/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/14/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/14/2025 Post-Tension Inspection Report is required.
02/14/2025 Soil Compaction Special Inspection is Required.
12/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01404
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Date Description Comments
12/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01404
Permite Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/20/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 3-20-25, partial pass for ufer only.
04/23/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
04/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01404
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/13/2025 COT - RSPL - Rough Soil Passed 13 March 25
Pass
03/13/2025 COT - RSPL - Sewer Passed 13 March 25
Pass
03/13/2025 COT - RSPL - Yard Water Line Passed
03/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-20-25, electrical underground, preslab, and reinforcement per approved plans-Okay to pour concrete.
03/20/2025 COT - RSBU - Preslab Passed 3-20-25, electrical underground, preslab, and reinforcement per approved plans-Okay to pour concrete.
03/20/2025 COT - RSEL - Electrical Underground Passed 3-20-25, electrical underground, preslab, and reinforcement per approved plans-Okay to pour concrete.
04/01/2025 BULD - Electrical Clearance Passed 1 APRIL 25
TEP ELECTRICAL CLEARANCE: ECO
04/11/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11 April 25
Pass
04/11/2025 COT - RSBU - Roof Nailing Passed 11 April 25
Pass
04/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/25/25 corrections made
04/15/2025 COT - RSEL - Grounding/Bonding Passed 4/25/25 passed
04/23/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/23/25
07/30/2025 COT - RSEL - Electrical Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSEL - Outdoor Lighting Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSME - Mechanical Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSPL - Plumbing Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 RSBU - Building Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 RSBU - Building Progress Passed
08/26/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 11 START_V1.PDF DOCUMENTS VIEW
MP 11 SIC-2025-02-25_V2.PDF DOCUMENTS VIEW