Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7327 S DEMPSEY AV
Apply Date:
12/20/2024
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-1224-01395
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
03/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01395
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 1
Date Name
12/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01395
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
12/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01395
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/12/2025 COT - BULD - SWG Clearance N/A Not Applicable No gas on site
05/12/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable No gas service on site
05/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Entire wall and door near staircase disconnected

5/12/25
1. Stairs not per plan, requires A34 clips at each stringer, requires 2x8 blocking at the top of the stairs.
2. LTP4's required in garage north and south shear walls. See detail 208.
3. Attic access compromised, hvac drain pan is encroaching into access.
05/12/2025 COT - RSBU - Roof Nailing N/A Re-inspection required Entire wall and door near staircase disconnected

Entire wall and door near staircase disconnected

5/12/25
1. Stairs not per plan, requires A34 clips at each stringer, requires 2x8 blocking at the top of the stairs.
2. LTP4's required in garage north and south shear walls. See detail 208.
3. Attic access compromised, hvac drain pan is encroaching into access.
4. Upstairs East bedroom, truss blocking is loose and needs to be nailed down.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01395
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/15/2025 COT - RSPL - Rough Soil Passed Passed 4/15/25 ok to backfill
04/15/2025 COT - RSPL - Sewer Passed Passed 4/15/25 ok to backfill
04/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/24/25 ok to pour concrete
04/24/2025 COT - RSBU - Preslab Passed Passed 4/24/25 ok to pour concrete
04/24/2025 COT - RSEL - Electrical Underground Passed Passed 4/24/25 ok to pour concrete
05/16/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
05/16/2025 COT - RSEL - Grounding/Bonding Passed connection made
05/16/2025 COT - RSPL - Backwater Valve Passed passed
05/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/16/25 corrections made
05/16/2025 COT - RSBU - Roof Nailing Passed 5/16/25 corrections made
06/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 6/9/25
06/09/2025 COT - RSPL - Yard Water Line Passed Passed 6/9/25
06/26/2025 COT - RSBU - Interior Shear Bracing Passed Passed 6/26/25 ok to tape
08/19/2025 COT - RSEL - Electrical Final Passed
08/19/2025 COT - RSEL - Outdoor Lighting Passed 8.19.25
APPROVED
08/19/2025 COT - RSME - Mechanical Final Passed 8.19.25
APPROVED
08/19/2025 COT - RSPL - Plumbing Final Passed
08/19/2025 ENGR Engineering Final Passed Make sure open head joints (weep holes) in back yard wall are cleared out of dirt.
08/19/2025 RSBU - Building Final Passed 8.19.25
APPROVED
08/19/2025 RSBU - Building Progress Passed 8.19.25
APPROVED

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 180 START_V1.PDF DOCUMENTS VIEW
MP 180 SIC-2025-03-26_V1.PDF DOCUMENTS VIEW