Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1223-01892
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 123
Address NEW:
9125 E CATALINA HY BLDG 123
Apply Date:
01/04/2024
Applicant:
Description:
DUPLEX CASITA1X1 T20-M0044
Permit Reviews
Permit Number - TC-MDP-1223-01892
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/22/2024 | APPROVED |
| 01/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/09/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01892
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
| Date | Description | Comments |
|---|---|---|
| 01/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/30/2023 | Post-Tension Inspection Report is required. | |
| 12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/04/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 03/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01892
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/20/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 11/14/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01892
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | COT - RSPL - Sewer | Passed | ||
| 02/20/2024 | COT - RSPL - Rough Soil | Passed | ||
| 02/26/2024 | COT - RSBU - Preslab | Passed | Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings. | |
| 02/26/2024 | COT - RSEL - Electrical Underground | Passed | Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings. | |
| 02/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings. | |
| 07/11/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 07/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/04/2024 | BULD - Electrical Clearance | Passed | Electrical panels & sub-panels are properly labeled for units 123 & 124. ECO Clearance issued for 9125 E Catalina Highway Units 123 & 124. Okay to energize main electrical panel | |
| 11/14/2024 | COT - RSME - Mechanical Final | Passed | ||
| 11/14/2024 | RSBU - Building Final | Passed | ||
| 11/14/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/14/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 11/14/2024 | COT - RSEL - Electrical Final | Passed | ||
| 12/11/2024 | ENGR Engineering Final | Passed |