Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/04/2024
Applicant:
Description:
DUPLEX CASITA1X1 T20-M0044

Permit Reviews

Permit Number - TC-MDP-1223-01892
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Start Date Submittal Complete Date Status  
08/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/22/2024 APPROVED Review Details
01/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/09/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1223-01892
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Date Description Comments
01/04/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/30/2023 Post-Tension Inspection Report is required.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/04/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/04/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1223-01892
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/20/2024 COT - BULD - SWG Clearance N/A Not Applicable
02/20/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/14/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1223-01892
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 18
Date Description Inspector Results Comments
02/20/2024 COT - RSPL - Sewer Passed
02/20/2024 COT - RSPL - Rough Soil Passed
02/26/2024 COT - RSBU - Preslab Passed Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings.
02/26/2024 COT - RSEL - Electrical Underground Passed Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings.
02/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings.
07/11/2024 COT - RSBU - Roof Nailing Passed
07/11/2024 COT - RSPL - Yard Water Line Passed
07/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/06/2024 COT - RSEL - Grounding/Bonding Passed
08/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/20/2024 COT - RSBU - Interior Shear Bracing Passed
10/04/2024 BULD - Electrical Clearance Passed Electrical panels & sub-panels are properly labeled for units 123 & 124. ECO Clearance issued for 9125 E Catalina Highway Units 123 & 124. Okay to energize main electrical panel
11/14/2024 COT - RSME - Mechanical Final Passed
11/14/2024 RSBU - Building Final Passed
11/14/2024 COT - RSEL - Outdoor Lighting Passed
11/14/2024 COT - RSPL - Plumbing Final Passed
11/14/2024 COT - RSEL - Electrical Final Passed
12/11/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
145903 PT BLDG 123-124 COMPLETE-2024-08-15_V1.PDF DOCUMENTS VIEW
TRUSS LAYOUT CASITAS 1X1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED SEWER PLANS - BUILDING 123 AND 124_V1.PDF DOCUMENTS VIEW
APPROVED WATER PLANS - BUILDING 123 AND 124_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SIC BUILDING 123 AND 124-2024-01-03_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SITE PLAN BUILDING 123 AND 124_V1.PDF DOCUMENTS VIEW
ELECTRICAL CONNECTIONS - BLDG 123 AND 124_V1.PDF DOCUMENTS VIEW