Inspection Status: Passed

Inspection History: COT - RSBU - Excavation/Rebar/ZoningĀ 

Date Description Inspector Results Comments
02/26/2024 COT - RSBU - Excavation/Rebar/ZoningĀ  Passed Footing is properly dug, forms are set, post tension cabling is installed per plans, rebar reinforcement is installed per plans and specifications, plumbing pipes are properly wrapped to protect against concrete damage, black box block outs are installed for shower and bathtub pipes, under slab electrical conduit is installed for kitchen island, and Ufer ground is properly installed and attached to rebar reinforcement. Okay to pour concrete for slab and footings.