Permit Details

Status:
Issued
Type:
Model Building Permit
Address:
9677 E HARKES DR
Apply Date:
04/22/2024
Applicant:
Joshua Swinney
Description:
Great Sand Dunes SFR Model Escalara

Permit Reviews

Permit Number - TC-MDP-1223-01886
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1223-01886
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Activity Conditions - 5
Date Name
01/20/2023 Post-Tension Inspection Report is required.
04/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/30/2024 Post-Tension Inspection Report is required.
04/30/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-1223-01886
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Date Description Comments
05/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1223-01886
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/21/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not required there is no gas to this house.
10/21/2024 COT - BULD - SWG Clearance N/A Not Applicable Not required there is no gas to this house.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1223-01886
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/07/2024 COT - RSPL - Rough Soil Passed
06/07/2024 COT - RSPL - Yard Water Line Passed
06/17/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
07/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior and interior walls are properly secured to concrete floor with shot pins, j-bolts, titan bolts, or masa clips. Plywood sheathing is installed and secured to studs per plan requirements for shear walls. Shear wall hold downs are installed with the required nails in plate and bolted through bottom plate with a titan bolts. Okay to proceed with mechanical, electrical, and plumbing rough-in.
07/29/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed per truss calc's and nailed to the top plate and H2.5 clips are properly installed and nailed to top plate. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
09/20/2024 COT - RSPL - Sewer Passed
10/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with installation of insulation and drywall.
11/12/2024 COT - RSBU - Interior Shear Bracing Passed 11-12-24, interior shear wall approved. Okay to tape and texture drywall.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 58 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 58 SIC-2024-04-22_V1.PDF DOCUMENTS VIEW