Permit: TC-MDP-1223-01866
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
950 W SILVERLAKE RD
Address NEW:
950 W SILVERLAKE RD
Apply Date:
09/16/2024
Applicant:
Jose Quintero
Description:
SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
Permit Reviews
Permit Number - TC-MDP-1223-01866
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/19/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 12/14/2024 | REQUIRES RESUBMIT |
| 09/20/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 10/10/2024 | REQUIRES RESUBMIT |
| 12/23/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 12/24/2024 | APPROVED |
| 12/24/2024 | RESTAMP - RESIDENTIAL v.1 | 12/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1223-01866
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Conditions
Permit Number - TC-MDP-1223-01866
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
| Date | Description | Comments |
|---|---|---|
| 11/19/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01866
Permite Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 1/29/25 Not ready; wrong plans on site and carpenters are still framing. |
| 03/26/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Re-inspection required | 3-26-25, drywall already taped/textured. Unable to verify grounding/bonding because of drywall. Therefore, you have a few options to satisfy code requirements. Remove drywall and schedule required inspections or submit a letter by the general contractor to the city for review and approval stating that construction was made per approved plans and meets the 2018 International Residential Code. This option(s) is required before certificate of completion or Cof O can be issued. |
| 07/11/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 03/26/2025 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3-26-25, drywall already taped/textured. Unable to verify grounding/bonding because of drywall. Therefore, you have a few options to satisfy code requirements. Remove drywall and schedule required inspections or submit a letter by the general contractor to the city for review and approval stating that construction was made per approved plans and meets the 2018 International Residential Code. This option(s) is required before certificate of completion or Cof O can be issued. |
| 07/11/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 07/11/2025 | ENGR Engineering Final | N/A | Not Ready | A sidewalk needs to be installed to connect both units to the ROW sidewalk. Does not meet the inclusive home design ordinance. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01866
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004 (Model master plan TC-MDP-0523-01028)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1/21/25: reinforcement per plan ok to proceed with concrete placement. | |
| 01/21/2025 | COT - RSBU - Preslab | Passed | 1/21/25: reinforcement per plan ok to proceed with concrete placement. | |
| 01/30/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/6/25 pass | |
| 02/07/2025 | BULD - Electrical Clearance | Passed | 2/7/25 approval for TEP ECO for both units 1 and 2 | |
| 02/12/2025 | COT - RSBU - Interior Shear Bracing | Passed | All walls sheetrocked and taped. | |
| 03/25/2025 | COT - RSPL - Yard Water Line | Passed | 3-25-25, main water line approved. Okay to backfill shading required. | |
| 03/25/2025 | COT - RSPL - Sewer | Passed | 3-25-25, HCS connection approved. Cleanouts mentioned from previous inspection verified in place. Okay to backfill-shading required. | |
| 03/26/2025 | COT - RSPL - Rough Soil | Passed | 3-26-25, approved. | |
| 07/11/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/11/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 07/11/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/11/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/11/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/11/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/11/2025 | RSBU - Building Final | Passed | ||
| 07/30/2025 | RSBU - Building Progress | Passed | 7.30.25 | |
| 07/30/2025 | ENGR Engineering Final | Passed | 07/30/25, parking meets and exceeds the required specs set by the parking standards. |