Status:
Complete
Type:
Model Building Permit
Address:
9532 E HARKES DR
Address NEW:
9532 E HARKES DR
Apply Date:
11/07/2024
Applicant:
Brianna Quiroz
Description:
Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)

Permit Reviews

Permit Number - TC-MDP-1124-01312
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Start Date Submittal Complete Date Status  
03/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/19/2025 APPROVED Review Details
07/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/02/2025 APPROVED Review Details
10/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01312
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/02/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/02/2025 Post-Tension Inspection Report is required.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/02/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/06/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01312
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/19/2025 COT - RSPL - Rough Soil Passed
05/19/2025 COT - RSPL - Sewer Passed
05/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/27/2025 COT - RSBU - Preslab Passed
05/27/2025 COT - RSEL - Electrical Underground Passed
05/27/2025 COT - RSEL - Grounding/Bonding Passed
06/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/26/25 corrections made
07/02/2025 COT - RSBU - Roof Nailing Passed 7/2/25 passed
08/20/2025 COT - RSPL - Yard Water Line Passed 8.20.25
Approved
08/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8.20.25
Approved
08/20/2025 COT - BULD - SWG Clearance Passed 8.20.25
Approved
08/20/2025 BULD - Electrical Clearance Passed 8.20.25
Approved
08/20/2025 COT - RSPL - Gas Pressure Test Passed 8.20.25
Approved
09/08/2025 COT - RSBU - Interior Shear Bracing Passed 9.8.25
Shear fastener schedule verified per plans
APPROVED
11/03/2025 COT - RSEL - Electrical Final Passed passed 11/3/25
11/03/2025 COT - RSEL - Outdoor Lighting Passed passed 11/3/25
11/03/2025 COT - RSME - Mechanical Final Passed passed 11/3/25
11/03/2025 COT - RSPL - Plumbing Final Passed passed 11/3/25
11/03/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is okay for CofO.
11/03/2025 RSBU - Building Final Passed passed 11/3/25
11/03/2025 RSBU - Building Progress Passed passed 11/3/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 30 SIC-2025-10-03_V1.PDF DOCUMENTS VIEW
Z510 EISENHOWER - TRUSS CALCULATIONS_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 30 SIC-2025-03-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 30 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 30 SIC-2025-03-04_V1.PDF DOCUMENTS VIEW