Permit: TC-MDP-1124-01291
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4802 E GREENWAY WASH DR
Address NEW:
4802 E GREENWAY WASH DR
Apply Date:
11/08/2024
Applicant:
Description:
SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Permit Reviews
Permit Number - TC-MDP-1124-01291
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2025 | APPROVED |
| 11/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/05/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01291
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Date | Description | Comments |
|---|---|---|
| 11/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/19/2024 | Post-Tension Inspection Report is required. | |
| 11/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01291
Permite Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | Toe down footing at garage not per plan. Missing footer for Htt4. Provide a min of 12" depth at all perimeter. 6/23/2025 |
| 06/23/2025 | COT - RSBU - Preslab | N/A | Re-inspection required | Toe down footing at garage not per plan. Missing footer for Htt4. Provide a min of 12" depth at all perimeter. 6/23/2025 |
| 07/01/2025 | COT - RSBU - Roof Nailing | N/A | Canceled | Canceled per Duke. 7/1/2025 |
| 07/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | Add a 35 clips above shear wall in garage per intermediate. Add h25 at heel truss. Add anchor bolts at marked areas. Missing pins at interior. 6" from edges at 24" o.c. Add nails and rsps south wall. 7/2/2025 |
| 07/07/2025 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | 7-7-25: will check at intermediates |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01291
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - RSPL - Rough Soil | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/13/2025 | COT - RSPL - Sewer | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/13/2025 | COT - RSPL - Yard Water Line | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/23/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/24/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/24/2025 | COT - RSBU - Preslab | Passed | Corrections were made. 6/24/2025 | |
| 07/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7-10-25: exterior clips/sheathing approved. Okay to continue with construction | |
| 07/16/2025 | COT - RSEL - Grounding/Bonding | Passed | 7-16-25: grounding/bonding approved. | |
| 07/17/2025 | BULD - Electrical Clearance | Passed | 7/17/25 corrections made CLEARANCE ECO | |
| 07/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 7/17/25 | |
| 07/17/2025 | RSBU - Building Progress | Passed | Passed 7/17/25 | |
| 07/18/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 7/18/25 | |
| 07/31/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/29/2025 | COT - BULD - SWG Clearance | Passed | 8.29.2025 Clearance for SW Gas. |
|
| 09/08/2025 | COT - RSEL - Outdoor Lighting | Passed | 9-8-25: approved. | |
| 09/08/2025 | COT - RSEL - Electrical Final | Passed | 9-8-25: electrical final approved. | |
| 09/09/2025 | COT - RSME - Mechanical Final | Passed | All corrections were made. 9/9/2025 | |
| 09/09/2025 | COT - RSPL - Plumbing Final | Passed | All corrections were made. 9/9/2025 | |
| 09/09/2025 | RSBU - Building Final | Passed | All corrections were made. 9/9/2025 | |
| 09/10/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |