Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 07/16/2025 |
RSBU - Building Progress |
|
Re-inspection required |
7-16-25: add firefoam to penetration above tub, seal vapor barrier at garage, master bedroom, great room in several areas & bedroom 4. Lower thermostats to 48" o.c., add strap to condensation line, all DWV must be under test, 12" clearance required between pex and can lights at bathroom 2-block using 2x4, osb, drywall,or relocate to allow for clearance requirements.Secure/staple EV charger and add a bank plate at marked location hallway from garage. |
| 07/17/2025 |
RSBU - Building Progress |
|
Passed |
Passed 7/17/25 |