Permit: TC-MDP-1124-01288
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4830 E GREENWAY WASH DR
Address NEW:
4830 E GREENWAY WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Permit Reviews
Permit Number - TC-MDP-1124-01288
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/15/2025 | APPROVED |
| 11/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/05/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01288
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Date | Description | Comments |
|---|---|---|
| 11/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/19/2024 | Post-Tension Inspection Report is required. | |
| 11/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01288
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2025 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 7/2/2025 | |
| 07/02/2025 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 7/2/2025 | |
| 07/02/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 7/2/2025 | |
| 07/11/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7-11-25: preslab, excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 07/11/2025 | COT - RSBU - Preslab | Passed | 7-11-25: preslab, excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 07/11/2025 | COT - RSEL - Electrical Underground | Passed | 7-11-25: electrical underground approved. | |
| 07/24/2025 | COT - RSBU - Roof Nailing | Passed | 7.24.25 Roof sheathing satisfactory |
|
| 07/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7/25/25 Pass |
|
| 08/04/2025 | BULD - Electrical Clearance | Passed | Approved 8.4.25 | |
| 08/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved 8.4.25 | |
| 08/04/2025 | COT - RSPL - Gas Pressure Test | Passed | Approved 8.4.25 | |
| 08/15/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/15/2025 | COT - RSBU - Interior Shear Bracing | Passed | 8.15.25 Fastener schedule verified. |
|
| 09/18/2025 | COT - BULD - SWG Clearance | Passed | 9-18-25: okay to install gas meter. SWG clearance issued. | |
| 09/25/2025 | COT - RSEL - Electrical Final | Passed | ||
| 09/25/2025 | COT - RSEL - Outdoor Lighting | Passed | approved | |
| 09/25/2025 | COT - RSME - Mechanical Final | Passed | ||
| 09/25/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 09/25/2025 | ENGR Engineering Final | Passed | Site is clear and in accordance with approved plans. | |
| 09/25/2025 | RSBU - Building Final | Passed | 9.25.25 approved |
|
| 09/25/2025 | RSBU - Building Progress | Passed |