Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1123-01845
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12748 E TORTOISE POINTE DR
Address NEW:
12748 E TORTOISE POINTE DR
Apply Date:
07/01/2024
Applicant:
Brandon Kempel
Description:
SFR RKK35G T21-M0090
Permit Reviews
Permit Number - TC-MDP-1123-01845
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 07/19/2024 | APPROVED |
| 07/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/02/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01845
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/19/2024 | Post-Tension Inspection Report is required. |
| 07/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1123-01845
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090
| Date | Description | Comments |
|---|---|---|
| 11/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1123-01845
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 9/23/24: Anchor bolts spacing greater than 6' o.c, more than 3 MASA clips with 1 leg up in continuous run, king studs missing throughout, MASA clips must be properly fastened, girder truss support 4x6 must be properly secured under girder per plans, h2.5 missing at trusses, shot pins at interior non bearing walls must be spaced no greater than 36" o.c, Back porch columns must be properly fastened at sill plate, HTT4 not properly installed. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 09/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 9/23/24: Anchor bolts spacing greater than 6' o.c, more than 3 MASA clips with 1 leg up in continuous run, king studs missing throughout, MASA clips must be properly fastened, girder truss support 4x6 must be properly secured under girder per plans, h2.5 missing at trusses, shot pins at interior non bearing walls must be spaced no greater than 36" o.c, Back porch columns must be properly fastened at sill plate, HTT4 not properly installed. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1123-01845
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to meter and under street pressure with no leaks. Blue tracer wire is installed around pipe from house to meter. Okay to shade pipe and backfill trench. | |
| 08/21/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line with green tracer wire from clean-outs to sewer connection installed and secured around pipe. Okay to shade pipes and backfill trenches. | |
| 08/21/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line with green tracer wire from clean-outs to sewer connection installed and secured around pipe. Okay to shade pipes and backfill trenches. | |
| 09/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/03/2024 | COT - RSBU - Preslab | Passed | ||
| 09/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/07/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-7-24, gas pressure test verified at 15psi. | |
| 11/08/2024 | BULD - Electrical Clearance | Passed | 11/8/24: corrected. ECO CLEARANCE ISSUED. | |
| 11/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11/8/24: Metal boxes have been replaced with larger boxes. Okay to proceed with insulation and drywall installation. | |
| 11/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to studs per plan requirements. Okay to proceed with tape, texture, and paint. | |
| 01/27/2025 | COT - BULD - SWG Clearance | Passed | 1/27/25 approval for SWG clearance. | |
| 02/06/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/6/25 | |
| 02/06/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/6/25 | |
| 02/06/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/6/25 | |
| 02/06/2025 | RSBU - Building Progress | Passed | passed 2/6/25 | |
| 02/12/2025 | COT - RSEL - Electrical Final | Passed | 2/12/24 corrections made CLEARANCE ECO | |
| 02/12/2025 | RSBU - Building Final | Passed | 2/12/24 corrections made |