Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/28/2023
Applicant:
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-1123-01843
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
06/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01843
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 4
Date Name
06/14/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/14/2024 Post-Installed Anchor Inspection Report is required.
06/14/2024 Post-Tension Inspection Report is required.
06/14/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-1123-01843
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
11/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/14/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01843
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/20/2024 BULD - Electrical Clearance N/A Re-inspection required Missing temp WR receptacle, breaker and UFER. 8/20/2024

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01843
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/11/2024 COT - RSPL - Rough Soil Passed
07/11/2024 COT - RSPL - Sewer Passed
07/11/2024 COT - RSPL - Yard Water Line Passed
07/19/2024 COT - RSEL - Electrical Underground Passed
07/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
07/22/2024 COT - RSBU - Preslab Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
07/22/2024 COT - RSEL - Grounding/Bonding Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
08/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Shear wall hold down are properly secured with nails and interior shear walls are secured with nails and titan bolts to the concrete floor. Plywood sheathing on shear walls are properly secured with nails per plan requirements. Exterior and interior walls are secured to concrete floor with masa clips, titan bolts, j-bolts, or shot pins. All straps are properly placed and secured with nails. Diagonal bracing is properly installed and nailed to each stud. Okay to proceed with rough-in work.
08/14/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and nailed to top plate, all trusses have H2.5 clips nailed to them. Plywood sheathing is properly secured to roof trusses with nails per plan and code requirements. Okay to proceed with rough-in work.
08/29/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/29/2024
09/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
09/11/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure with no leaks. Okay to proceed
10/01/2024 COT - RSBU - Interior Shear Bracing Passed 10-1-24, inspected and approved interior shear wall. Okay to tape and texture.
11/21/2024 COT - BULD - SWG Clearance Passed 11-21-24, approved for Southwest gas connection.
12/05/2024 COT - RSEL - Electrical Final Passed 12-5-24, electrical final approved.
12/05/2024 COT - RSEL - Outdoor Lighting Passed 12-5-24, outdoor lighting final approved.
12/10/2024 COT - RSPL - Plumbing Final Passed 12-10-24, plumbing final approved.
12/10/2024 COT - RSME - Mechanical Final Passed 12-10-24, mechanical final approved.
12/12/2024 RSBU - Building Final Passed 12-12-24, building final approved.
12/12/2024 ENGR Engineering Final Passed
12/13/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-12_V1.PDF DOCUMENTS VIEW