Permit: TC-MDP-1123-01829
Permit Details
Apply Date:
11/21/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-1123-01829
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/22/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/29/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01829
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
11/22/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
11/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
11/22/2023 | Post-Tension Inspection Report is required. |
11/22/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
11/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1123-01829
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
11/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01829
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2024 | COT - RSEL - Electrical Final | N/A | Not Ready | Complete electrical system and cover meter socket. |
04/26/2024 | COT - RSME - Mechanical Final | N/A | Partial Pass | Mechanical equipment is being powered by a portable generator that is properly grounded and connected into the electric panel. Okay to issue a Level 4 Temporary Certificate of Occupancy for this building to be utilized as a Construction Office/Model Home for K B Homes. Once building is converted back into a Single Family Residence then an inspection will be required for a Permanent Certificate of Occupancy. |
04/03/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
04/03/2024 | RSBU - Building Final | N/A | Not Ready | House is constructed as Model/sales office; reschedule when converted to SFR. |
04/03/2024 | RSBU - Building Progress | N/A | Not Ready | obtain partial approval of Electric final for use as Model home. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01829
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/06/2023 | COT - RSPL - Yard Water Line | Passed | ||
12/06/2023 | COT - RSPL - Rough Soil | Passed | ||
12/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/12/2023 | COT - RSBU - Preslab | Passed | ||
12/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/13/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
12/20/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/20/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
01/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/08/2024 | BULD - Electrical Clearance | Passed | clear eco | |
02/08/2024 | COT - BULD - SWG Clearance | Passed | clear gas | |
03/14/2024 | COT - RSPL - Sewer | Passed | ||
04/03/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/03/2024 | ENGR Engineering Final | Passed | ||
08/23/2024 | COT - RSEL - Electrical Final | Passed | 8/23/24: Construction is complete. Electrical, water, and sewer connections have been completed. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. K B Homes will be utilizing this as their Model Home until entire subdivision is completed. Okay to issue Permanent Certificate of Occupancy. | |
08/23/2024 | COT - RSME - Mechanical Final | Passed | 8/23/24: Construction is complete. Electrical, water, and sewer connections have been completed. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. K B Homes will be utilizing this as their Model Home until entire subdivision is completed. Okay to issue Permanent Certificate of Occupancy. | |
08/23/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/23/2024 | RSBU - Building Final | Passed | ||
08/25/2024 | RSBU - Building Progress | Passed | 8/23/24: Construction is complete. Electrical, water, and sewer connections have been completed. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. K B Homes will be utilizing this as their Model Home until entire subdivision is completed. Okay to issue Permanent Certificate of Occupancy. |