Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
Permit Number - TC-MDP-1123-01829
Inspection Description - COT - RSEL - Electrical Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2024 | COT - RSEL - Electrical Final | Not Ready | Complete electrical system and cover meter socket. | |
04/26/2024 | COT - RSEL - Electrical Final | Partial Pass | Mechanical equipment and building electric is being powered by a portable generator that is properly grounded and connected into the electric panel. Okay to issue a Level 4 Temporary Certificate of Occupancy for this building to be utilized as a Construction Office/Model Home for K B Homes. Once building is converted back into a Single Family Residence then an inspection will be required for a Permanent Certificate of Occupancy. | |
08/23/2024 | COT - RSEL - Electrical Final | Passed | 8/23/24: Construction is complete. Electrical, water, and sewer connections have been completed. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. K B Homes will be utilizing this as their Model Home until entire subdivision is completed. Okay to issue Permanent Certificate of Occupancy. |