Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
04/02/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-1123-01826
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
04/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/11/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01826
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 6
Date Name
04/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/11/2024 Post-Tension Inspection Report is required.
04/11/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1123-01826
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
11/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01826
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is complete from double clean outs and backwater valve to all fixture locations in the house. Green tracer wire is installed from clean outs to the end of sewer pipe, not connected to the main sewer system at this point in time.
04/26/2024 COT - RSPL - Yard Water Line Passed Main Water Line is under 65# of air pressure and holding without leaking. Okay to shade pipe and backfill trench.
04/26/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete from double clean outs and backwater valve to all fixture locations in the house. Green tracer wire is installed from clean outs to the end of sewer pipe, not connected to the main sewer system at this point in time.
05/08/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
06/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed Plywood sheathing for exterior shear walls is properly secured to studs per plan requirements. All masa clips and shear wall hold downs are properly nailed to bottom plates and wall studs. Bottom plates are secured with cut nails, titan bolts, or j-bolts. Okay to proceed with plumbing top out.
06/12/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 hurricane ties. Plywood sheathing is securely attached to trusses with nails per plan. Okay to proceed with plumbing top out.
07/17/2024 COT - RSPL - Gas Pressure Test Passed
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/09/2024 COT - RSBU - Interior Shear Bracing Passed
09/11/2024 COT - RSPL - Sewer Passed 9/11/24: Sewer is connected and under test. Okay to shade pipe and backfill trench.
09/16/2024 BULD - Electrical Clearance Passed Passes electrical clearance ECO 9/16/2024
10/08/2024 COT - BULD - SWG Clearance Passed SWG for meter connection only

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 30 START_V1.PDF DOCUMENTS VIEW
BTIII 30 SIC-2024-04-02_V1.PDF DOCUMENTS VIEW