Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
Permit Number - TC-MDP-1123-01826
Inspection Description - COT - RSBU - Preslab
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/08/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade. |