Permit: TC-MDP-1025-00683
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
1225 S HERNDON AV
Address NEW:
1225 S HERNDON AV
Apply Date:
10/27/2025
Applicant:
Fernando Hinojosa
Description:
SFR (MODEL MASTER PLAN TC-MDP-0325-00203)
Permit Reviews
Permit Number - TC-MDP-1025-00683
Permit Status: Inspections complete
Permit Description: SFR (MODEL MASTER PLAN TC-MDP-0325-00203)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 02/09/2026 | REQUIRES RESUBMIT |
| 12/08/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 12/26/2025 | REQUIRES RESUBMIT |
| 03/19/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 04/02/2026 | APPROVED |
| 10/29/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/10/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1025-00683
Permit Status: Inspections complete
Permit Description: SFR (MODEL MASTER PLAN TC-MDP-0325-00203)
| Date | Description | Comments |
|---|---|---|
| 10/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/28/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/28/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00683
Permite Description: SFR (MODEL MASTER PLAN TC-MDP-0325-00203)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2026 | COT - RSPL - Sewer | N/A | Not Ready | 07/06/2026 Not ready. |
| 09/29/2026 | ENGR Engineering Final | N/A | Partial Pass | Unsatisfied conditions on permit need to be satisfied prior to final. The concrete that spread under forms at landing needs to be removed for drainage and weep screed clearance. Otherwise site is complete. reschedule when ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00683
Permit Description: SFR (MODEL MASTER PLAN TC-MDP-0325-00203)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2026 | COT - RSPL - Rough Soil | Passed | 4.10.26 Approved |
|
| 04/10/2026 | COT - RSPL - Yard Water Line | Passed | 4.10.26 Approved |
|
| 04/13/2026 | COT - RSBU - Preslab | Passed | 04/13/2026 Approved per site plan and reinforcement. Okay for concrete placement. |
|
| 04/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/13/2026 Approved per site plan and reinforcement. Okay for concrete placement. |
|
| 05/05/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 05/05/2026 Approved per plan, added shot pin at interior wall sill plate within 6" from edge. |
|
| 05/06/2026 | COT - RSBU - Roof Nailing | Passed | 05/06/2026 Verified added bracing at A01 trusses throughout. |
|
| 05/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/18/2026 Corrections made. |
|
| 06/04/2026 | BULD - Electrical Clearance | Passed | 6-4-26: okay to energize- ECO clearance issued to TEP. | |
| 07/15/2026 | COT - RSPL - Sewer | Passed | 07/15/2026 Holding under test with green tracer wire to HCS, backwater valve installed. Okay to backfill - shading required. |
|
| 09/18/2026 | COT - RSEL - Electrical Final | Passed | ||
| 09/18/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/18/2026 | COT - RSME - Mechanical Final | Passed | ||
| 09/18/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 09/18/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 10/05/2026 | ENGR Engineering Final | Passed | ||
| 10/05/2026 | RSBU - Building Final | Passed | 10/5/26: all conditions satisfied. Building final approved-okay to apply for letter of completion/ C of O. |