Permit: TC-MDP-1025-00643
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2527 S CAMPBELL AV UNIT 1
Address NEW:
2527 S CAMPBELL AV UNIT 1
Apply Date:
10/07/2025
Applicant:
Charles Corrales
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Permit Reviews
Permit Number - TC-MDP-1025-00643
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 02/25/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 02/20/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 02/25/2026 | APPROVED |
| 12/10/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 12/19/2025 | REQUIRES RESUBMIT |
| 10/07/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/04/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1025-00643
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/27/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 10/06/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1025-00643
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Date | Description | Comments |
|---|---|---|
| 10/06/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/21/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00643
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2026 | COT - RSPL - Rough Soil | Passed | 3-13-26: underground plumbing verified under test and per approved plans. Okay to backfill using shading materials. Note: will check gray water at intermediates. |
|
| 03/13/2026 | COT - RSPL - Yard Water Line | Passed | 3-13-26: main water line approved. Okay to backfill using shading materials. | |
| 03/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 03/18/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 03/18/2026 | COT - RSBU - Preslab | Passed | 03/18/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 04/01/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/01/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/17/2026 | BULD - Electrical Clearance | Passed | Passed 4/17/26 CLEARANCE ECO | |
| 04/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/17/26 passed | |
| 04/24/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/24/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 08/03/2026 | COT - RSEL - Electrical Final | Passed | ||
| 08/03/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/03/2026 | COT - RSME - Mechanical Final | Passed | ||
| 08/03/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/03/2026 | RSBU - Building Final | Passed | ||
| 08/11/2026 | COT - RSPL - Sewer | Passed | ||
| 08/12/2026 | ENGR Engineering Final | Passed | Appropriate thresholds are installed, sewer clean-outs are cut to acceptable height, parking block pins are driven, exposed pvc is painted. Site is complete in accordance with approved plans. |