Permit: TC-MDP-1025-00610
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2149 E SUPERSONIC ST
Address NEW:
2149 E SUPERSONIC ST
Apply Date:
05/20/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Permit Reviews
Permit Number - TC-MDP-1025-00610
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/29/2026 | APPROVED |
| 09/10/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/10/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1025-00610
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
| Date | Description | Comments |
|---|---|---|
| 05/29/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/29/2026 | Post-Installed Anchor Inspection Report is required. | |
| 10/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00610
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | COT - RSPL - Backwater Valve | Passed | 6.10.26 Approved |
|
| 06/10/2026 | COT - RSPL - Rough Soil | Passed | ||
| 06/10/2026 | COT - RSPL - Sewer | Passed | 6.10.26 Approved |
|
| 06/10/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 06/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/16/2026 | COT - RSBU - Preslab | Passed | ||
| 06/16/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/23/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 07/09/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/09/2026 | RSBU - Building Progress | Passed | ||
| 07/10/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 07/10/2026 Corrections made. |
|
| 07/14/2026 | BULD - Electrical Clearance | Passed | 07/14/2026 Clearance TEP ECO. |
|
| 07/23/2026 | COT - RSBU - Interior Shear Bracing | Passed | 7-23-26 okay to cover. | |
| 08/20/2026 | COT - BULD - SWG Clearance | Passed | 8-20-26 SWG Clearance approved | |
| 09/15/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/15/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 09/15/2026 | ENGR Engineering Final | Passed | ||
| 09/18/2026 | COT - RSEL - Electrical Final | Passed | 9-18-26 All previous items have been corrected electrical final approved | |
| 09/18/2026 | COT - RSME - Mechanical Final | Passed | 9-18-26 All previous items have been corrected mechanical final approved | |
| 09/18/2026 | RSBU - Building Final | Passed | 9-18-26 All previous items have been corrected building final approved |