Permit: TC-MDP-1024-01242
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2632 S J CHRISTOPHER ST
Address NEW:
2632 S J CHRISTOPHER ST
Apply Date:
10/28/2024
Applicant:
Mark Alteri
Description:
PV 1074 SFR
Permit Reviews
Permit Number - TC-MDP-1024-01242
Permit Status: Complete
Permit Description: PV 1074 SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/10/2025 | APPROVED |
| 03/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/01/2025 | APPROVED |
| 10/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/15/2024 | APPROVED |
| 01/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/25/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1024-01242
Permit Status: Complete
Permit Description: PV 1074 SFR
| Date | Description | Comments |
|---|---|---|
| 10/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/19/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/23/2024 | Post-Tension Inspection Report is required. | |
| 10/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 12/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01242
Permite Description: PV 1074 SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | Partial pass. Pending plumbing wrap. 12/2/2024 12/3/24: per previous notes. |
| 12/03/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | Partial pass. Pending plumbing wrap. 12/2/2024 12/3/24: per previous notes |
| 12/02/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | |
| 06/26/2025 | ENGR Engineering Final | N/A | Not Ready | Landscaping and dg not finished. Ensure drainage from back yard runs out to front of house. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01242
Permit Description: PV 1074 SFR
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | COT - RSPL - Rough Soil | Passed | 11/22/24 pass | |
| 11/22/2024 | COT - RSPL - Sewer | Passed | 11/22/24 pass | |
| 11/22/2024 | COT - RSPL - Yard Water Line | Passed | 11/22/24 pass | |
| 12/03/2024 | COT - RSEL - Electrical Underground | Passed | Conduit not in place. 12/2/2024 12/3/24: corrections made. |
|
| 12/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/26/24 pass | |
| 12/26/2024 | COT - RSBU - Roof Nailing | Passed | 12/26/24 pass | |
| 02/06/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 2/6/25 pass | |
| 02/06/2025 | RSBU - Building Progress | Passed | ||
| 02/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/13/25 pass | |
| 02/13/2025 | COT - RSPL - Gas Pressure Test | Passed | 2/13/25 pass | |
| 02/28/2025 | COT - RSBU - Interior Shear Bracing | Passed | Framing complete with Sheetrock throughout; Fire/shear walls in place. Ok to tape throughout. | |
| 03/05/2025 | BULD - Electrical Clearance | Passed | 3/5/25: TEP ECO CLEARANCE APPROVED | |
| 06/16/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 6/16/2025 | |
| 06/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/26/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/15/2025 | COT - RSEL - Electrical Final | Passed | 7-15-25: corrections made-electrical final approved. | |
| 07/15/2025 | COT - RSME - Mechanical Final | Passed | 7-15-25: corrections made-mechanical & building finals approved. | |
| 07/15/2025 | COT - RSPL - Plumbing Final | Passed | 7-15-25: plumbing final approved. | |
| 07/15/2025 | ENGR Engineering Final | Passed | Site is safe and according to plans. | |
| 07/15/2025 | RSBU - Building Final | Passed | 7-15-25: corrections made-mechanical & building finals approved. |