Permit: TC-MDP-1024-01229
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4722 E JULIAN WASH DR
Address NEW:
4722 E JULIAN WASH DR
Apply Date:
10/22/2024
Applicant:
Dana Petty
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-1024-01229
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
| 11/14/2024 | RESTAMP - RESIDENTIAL v.1 | 11/15/2024 | APPROVED |
| 04/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01229
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
| Date | Description | Comments |
|---|---|---|
| 10/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/30/2024 | Post-Tension Inspection Report is required. | |
| 10/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01229
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 2/25/25:TEMP power must be on 20AMP breaker, 3" Grey water in dining room missing per plans, seal penetration through vapor barrier in garage and pantry, properly secure romex at garage entrance into living space, FHA plate required at microwave exhaust duct with fire block, seal penetration through top plate first floor bedroom, seal underground conduit, nail plate under stairs for romex protection (less than 1 1/4" from face of faceplate), romex must be supported 12" from light fixture at stairs, FHA plate required at dryer exhaust duct, exhaust fan in upstairs bathroom incomplete, blocking required at 4-gang box upstairs bathroom, STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
| 02/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 2/25/25:TEMP power must be on 20AMP breaker, 3" Grey water in dining room missing per plans, seal penetration through vapor barrier in garage and pantry, properly secure romex at garage entrance into living space, FHA plate required at microwave exhaust duct with fire block, seal penetration through top plate first floor bedroom, seal underground conduit, nail plate under stairs for romex protection (less than 1 1/4" from face of faceplate), romex must be supported 12" from light fixture at stairs, FHA plate required at dryer exhaust duct, exhaust fan in upstairs bathroom incomplete, blocking required at 4-gang box upstairs bathroom, STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
| 02/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 2/25/25:TEMP power must be on 20AMP breaker, 3" Grey water in dining room missing per plans, seal penetration through vapor barrier in garage and pantry, properly secure romex at garage entrance into living space, FHA plate required at microwave exhaust duct with fire block, seal penetration through top plate first floor bedroom, seal underground conduit, nail plate under stairs for romex protection (less than 1 1/4" from face of faceplate), romex must be supported 12" from light fixture at stairs, FHA plate required at dryer exhaust duct, exhaust fan in upstairs bathroom incomplete, blocking required at 4-gang box upstairs bathroom, STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
| 05/09/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Garage lighting tied into garage receptacle. 5/9/2025 |
| 05/09/2025 | RSBU - Building Final | N/A | Re-inspection required | Garage lighting tied into garage receptacle. 5/9/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01229
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | COT - RSPL - Sewer | Passed | Passed, ok to backfill 1/13/25 | |
| 01/13/2025 | COT - RSPL - Rough Soil | Passed | Passed, ok to backfill 1/13/25 | |
| 01/13/2025 | COT - RSPL - Backwater Valve | Passed | Passed, ok to backfill 1/13/25 | |
| 01/14/2025 | COT - RSPL - Yard Water Line | Passed | Depth and tracer wire correct, ok to backfill | |
| 01/17/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 1/17/25 ok to pour concrete | |
| 01/17/2025 | COT - RSEL - Electrical Underground | Passed | Passed 1/17/25 ok to pour concrete | |
| 01/17/2025 | COT - RSBU - Preslab | Passed | Passed 1/17/25 ok to pour concrete | |
| 01/17/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 1/17/25 ok to pour concrete | |
| 01/31/2025 | COT - RSBU - Roof Nailing | Passed | 1/31/25 pass | |
| 02/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/7/25 corrections made | |
| 03/03/2025 | BULD - Electrical Clearance | Passed | 3 March 25 TEP CLEARANCE: ECO |
|
| 03/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3 March 25 All corrections have been made. |
|
| 03/03/2025 | COT - RSPL - Gas Pressure Test | Passed | 3 March 25 Pass |
|
| 03/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/28/2025 | COT - BULD - SWG Clearance | Passed | 4/28/25: SWG clearance approved. Ok for meter tag | |
| 05/05/2025 | ENGR Engineering Final | Passed | CO READY | |
| 05/07/2025 | RSBU - Building Progress | Passed | ||
| 05/09/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/09/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/09/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/13/2025 | COT - RSEL - Electrical Final | Passed | 5/13/25 Pass |
|
| 05/13/2025 | RSBU - Building Final | Passed | 5/13/25 Pass |