Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2/25/25:TEMP power must be on 20AMP breaker, 3" Grey water in dining room missing per plans, seal penetration through vapor barrier in garage and pantry, properly secure romex at garage entrance into living space, FHA plate required at microwave exhaust duct with fire block, seal penetration through top plate first floor bedroom, seal underground conduit, nail plate under stairs for romex protection (less than 1 1/4" from face of faceplate), romex must be supported 12" from light fixture at stairs, FHA plate required at dryer exhaust duct, exhaust fan in upstairs bathroom incomplete, blocking required at 4-gang box upstairs bathroom, STOPPED INSPECTION MORE ITEMS MAY BE ADDED | |
| 03/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3 March 25 All corrections have been made. |