Inspection History Details
Inspection Status: Canceled
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2025 | RSBU - Building Final | Canceled | ||
| 05/07/2025 | RSBU - Building Final | Re-inspection required | 5/7/25: weep screed clearance must be 4" from grade, all exterior plastic piping must be coated, Thermostat shall be no higher than 48" A.F.F, Plastic grommets required at air handler and disconnect in attic. | |
| 05/09/2025 | RSBU - Building Final | Re-inspection required | Garage lighting tied into garage receptacle. 5/9/2025 | |
| 05/13/2025 | RSBU - Building Final | Passed | 5/13/25 Pass |