Permit: TC-MDP-1024-01203
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3609 E NEBRASKA SV
Address NEW:
3609 E NEBRASKA SV
Apply Date:
10/15/2024
Applicant:
Description:
Roca Realty model L 1-12
Permit Reviews
Permit Number - TC-MDP-1024-01203
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01203
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01203
Permite Description: Roca Realty model L 1-12
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 4-29-25, missing green tracer wire on underground plumbing. |
| 08/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 8/8/25: Properly secure Flex duct in attic, UFER improperly terminated, plastic grommets required at exhaust fans, seal all penetrations going through vapor barrier, PEX must be supported off of gusset plate in south west bedroom attic space. |
| 08/08/2025 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 5/8/25: Address required on site, Site plan required on site, reinforcement overlap must be 24" min, all reinforcement must maintain 3" from grade, A.B required at slab to tamped down, Footing size not per plan. all plastic piping that will be in contact with concrete must be fully wrapped. 5/13/25 Partial pass, UFER. 8/8/25: Ground at UFER must be properly terminated. |
| 07/21/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 7-21-25: not ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01203
Permit Description: Roca Realty model L 1-12
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2025 | COT - RSPL - Rough Soil | Passed | 5-5-25, underground plumbing verified per plans. Okay to backfill-shading required. | |
| 05/05/2025 | COT - RSPL - Sewer | Passed | 5-5-25, sewer connection approved. Okay to backfill-shading required. | |
| 05/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/13/25 All corrections are made. |
|
| 05/13/2025 | COT - RSEL - Electrical Underground | Passed | 5/13/25 All corrections are made. |
|
| 05/13/2025 | COT - RSBU - Preslab | Passed | 5/13/25 All corrections are made. |
|
| 07/21/2025 | COT - RSBU - Roof Nailing | Passed | 7-21-25: okay to dry-in roof. | |
| 07/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/14/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8-14-25: corrections made-okay to continue with construction. | |
| 08/14/2025 | COT - RSEL - Grounding/Bonding | Passed | 8-14-25: grounding/bonding approved. | |
| 08/14/2025 | COT - RSPL - Yard Water Line | Passed | 8-14-25: main water line approved. Okay to backfill trench with shading materials. | |
| 09/12/2025 | BULD - Electrical Clearance | Passed | 9.12.2025 Clearance for TEP ECO. |
|
| 11/12/2025 | COT - RSEL - Electrical Final | Passed | 11-12-25: electrical final approved. | |
| 11/12/2025 | COT - RSME - Mechanical Final | Passed | 11-12-25: mechanical final approved. | |
| 11/12/2025 | COT - RSEL - Outdoor Lighting | Passed | 11-12-25: approved. | |
| 11/12/2025 | COT - RSPL - Plumbing Final | Passed | 11-12-25: plumbing final approved. | |
| 11/12/2025 | RSBU - Building Final | Passed | 11-12-25: building final approved. | |
| 11/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/13/2025 | RSBU - Building Progress | Passed | ||
| 11/14/2025 | ENGR Engineering Final | Passed |