Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
3609 E NEBRASKA SV
Apply Date:
10/15/2024
Applicant:
Description:
Roca Realty model L 1-12

Permit Reviews

Permit Number - TC-MDP-1024-01203
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
Start Date Submittal Complete Date Status  
10/21/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 11/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01203
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01203
Permite Description: Roca Realty model L 1-12
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/29/2025 COT - RSPL - Rough Soil N/A Re-inspection required 4-29-25, missing green tracer wire on underground plumbing.
08/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 8/8/25: Properly secure Flex duct in attic, UFER improperly terminated, plastic grommets required at exhaust fans, seal all penetrations going through vapor barrier, PEX must be supported off of gusset plate in south west bedroom attic space.
08/08/2025 COT - RSEL - Grounding/Bonding N/A Re-inspection required 5/8/25: Address required on site, Site plan required on site, reinforcement overlap must be 24" min, all reinforcement must maintain 3" from grade, A.B required at slab to tamped down, Footing size not per plan. all plastic piping that will be in contact with concrete must be fully wrapped.

5/13/25
Partial pass, UFER.
8/8/25: Ground at UFER must be properly terminated.
07/21/2025 COT - RSBU - Interior Shear Bracing N/A Not Ready 7-21-25: not ready.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01203
Permit Description: Roca Realty model L 1-12
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/05/2025 COT - RSPL - Rough Soil Passed 5-5-25, underground plumbing verified per plans. Okay to backfill-shading required.
05/05/2025 COT - RSPL - Sewer Passed 5-5-25, sewer connection approved. Okay to backfill-shading required.
05/13/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5/13/25
All corrections are made.
05/13/2025 COT - RSEL - Electrical Underground Passed 5/13/25
All corrections are made.
05/13/2025 COT - RSBU - Preslab Passed 5/13/25
All corrections are made.
07/21/2025 COT - RSBU - Roof Nailing Passed 7-21-25: okay to dry-in roof.
07/25/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8-14-25: corrections made-okay to continue with construction.
08/14/2025 COT - RSEL - Grounding/Bonding Passed 8-14-25: grounding/bonding approved.
08/14/2025 COT - RSPL - Yard Water Line Passed 8-14-25: main water line approved. Okay to backfill trench with shading materials.
09/12/2025 BULD - Electrical Clearance Passed 9.12.2025
Clearance for TEP ECO.
11/12/2025 COT - RSEL - Electrical Final Passed 11-12-25: electrical final approved.
11/12/2025 COT - RSME - Mechanical Final Passed 11-12-25: mechanical final approved.
11/12/2025 COT - RSEL - Outdoor Lighting Passed 11-12-25: approved.
11/12/2025 COT - RSPL - Plumbing Final Passed 11-12-25: plumbing final approved.
11/12/2025 RSBU - Building Final Passed 11-12-25: building final approved.
11/13/2025 COT - RSBU - Interior Shear Bracing Passed
11/13/2025 RSBU - Building Progress Passed
11/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW