Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - RSBU - Preslab | Re-inspection required | 5/8/25: Address required on site, Site plan required on site, reinforcement overlap must be 24" min, all reinforcement must maintain 3" from grade, A.B required at slab to tamped down, Footing size not per plan. all plastic piping that will be in contact with concrete must be fully wrapped. | |
| 05/13/2025 | COT - RSBU - Preslab | Passed | 5/13/25 All corrections are made. |