Permit: TC-MDP-1024-01201
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4719 E JULIAN WASH DR
Address NEW:
4719 E JULIAN WASH DR
Apply Date:
11/04/2024
Applicant:
Description:
SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Permit Reviews
Permit Number - TC-MDP-1024-01201
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2025 | APPROVED |
| 11/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/25/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01201
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/06/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/06/2024 | Post-Tension Inspection Report is required. | |
| 10/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/06/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01201
Permite Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 4/28/25: seal penetration through vapor barrier at bedroom north west, secure nm cable near attic access, FHA PLATE behind kitchen exhaust, seal top plate penetration at bathroom. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01201
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - RSPL - Yard Water Line | Passed | Passed 3/18/25 ok to backfill | |
| 03/18/2025 | COT - RSPL - Sewer | Passed | Passed 3/18/25 ok to backfill | |
| 03/18/2025 | COT - RSPL - Rough Soil | Passed | Passed 3/18/25 ok to backfill | |
| 03/18/2025 | COT - RSPL - Backwater Valve | Passed | Passed 3/18/25 ok to backfill | |
| 03/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/25/25 ok to pour concrete | |
| 03/25/2025 | COT - RSBU - Preslab | Passed | Passed 3/25/25 ok to pour concrete | |
| 03/25/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/25/25 ok to pour concrete | |
| 03/25/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 3/25/25 ok to pour concrete | |
| 04/08/2025 | COT - RSBU - Roof Nailing | Passed | 8 April 25 ok to dry roof. |
|
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4-25-25, panel is okay for it to be energized.ECO clearance issued to TEP. | |
| 04/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4-25-25, exterior clips/sheathing approved. | |
| 04/25/2025 | COT - RSPL - Gas Pressure Test | Passed | 4-25-25, gas pressure test approved. | |
| 04/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-24-25, minimum of 2 screws required for metal bracket that holds pex lines at bathroom, secondary HVAC pvc not extended to the exterior, a 12" clearance is required between pex lines & can lights- relocate pex to allow clearance requirements or block with 2x4, osb, plywood or drywall.add bank plates where electrical wires are within 1 1/4" from edge of studs- required near 4-gang box near back sliding glass door. 4/28/25: seal penetration through vapor barrier at bedroom north west, secure nm cable near attic access, FHA PLATE behind kitchen exhaust, seal top plate penetration at bathroom. 4/30/25: CORRECTIONS MADE OK TO PROCEED |
|
| 05/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/20/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 6/20/2025 | |
| 07/01/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/01/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/01/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/01/2025 | ENGR Engineering Final | Passed | Site is safe and in accordance with approved plans. | |
| 07/01/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/01/2025 | RSBU - Building Final | Passed | ||
| 07/01/2025 | RSBU - Building Progress | Passed |