Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-1024-01201

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
04/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 4-24-25, minimum of 2 screws required for metal bracket that holds pex lines at bathroom, secondary HVAC pvc not extended to the exterior, a 12" clearance is required between pex lines & can lights- relocate pex to allow clearance requirements or block with 2x4, osb, plywood or drywall.add bank plates where electrical wires are within 1 1/4" from edge of studs- required near 4-gang box near back sliding glass door
04/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 4/28/25: seal penetration through vapor barrier at bedroom north west, secure nm cable near attic access, FHA PLATE behind kitchen exhaust, seal top plate penetration at bathroom.
04/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-24-25, minimum of 2 screws required for metal bracket that holds pex lines at bathroom, secondary HVAC pvc not extended to the exterior, a 12" clearance is required between pex lines & can lights- relocate pex to allow clearance requirements or block with 2x4, osb, plywood or drywall.add bank plates where electrical wires are within 1 1/4" from edge of studs- required near 4-gang box near back sliding glass door.
4/28/25: seal penetration through vapor barrier at bedroom north west, secure nm cable near attic access, FHA PLATE behind kitchen exhaust, seal top plate penetration at bathroom.
4/30/25: CORRECTIONS MADE OK TO PROCEED