Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4734 E JULIAN WASH DR
Apply Date:
10/15/2024
Applicant:
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-1024-01197
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/04/2024 APPROVED Review Details
04/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01197
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/21/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01197
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/12/2025 BULD - Electrical Clearance N/A Not Ready 2/12/25 breakers needed at main panel.
02/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 2/12/25 fire foam at window to left of first bathroom, ground back patio light receptacle. Partial pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01197
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/30/2024 COT - RSPL - Yard Water Line Passed Piping holds water, installed per plans, ok to backfill 12/30/24
12/30/2024 COT - RSPL - Sewer Passed Piping holds water, installed per plans, ok to backfill 12/30/24
12/30/2024 COT - RSPL - Rough Soil Passed Rebar and hold downs per plan, ok to pour concrete 12/30/24
12/30/2024 COT - RSPL - Backwater Valve Passed Piping holds water, installed per plans, ok to backfill 12/30/24
01/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 01/09/25
1. TRENCHING IS TOO SHALLOW FOR THE HOLD-DOWNS, PLEASE SEE DETAILS SD4\5A.

2. Check spacing on NW hold down in the garage, should be minimum of 1/2" from outside form.

3. Set MASA clips in place where needed before slab.
01/09/2025 COT - RSBU - Preslab Passed 01/09/25
1. TRENCHING IS TOO SHALLOW FOR THE HOLD-DOWNS, PLEASE SEE DETAILS SD4\5A.

2. Check spacing on NW hold down in the garage, should be minimum of 1/2" from outside form.

3. Set MASA clips in place where needed before slab.
01/09/2025 COT - RSEL - Electrical Underground Passed
01/09/2025 COT - RSEL - Grounding/Bonding Passed
01/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/25/25
Pass.
01/28/2025 COT - RSBU - Roof Nailing Passed 1/25/25
Pass.
02/12/2025 COT - RSPL - Gas Pressure Test Passed 2/12/25 pass
02/13/2025 BULD - Electrical Clearance Passed 2/13/25 corrections made CLEARANCE ECO
02/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/13/25 corrections made
02/24/2025 COT - RSBU - Interior Shear Bracing Passed
04/11/2025 COT - BULD - SWG Clearance Passed 4/11/25
SOUTHWEST GAS CLEARANCE: SWG
04/28/2025 RSBU - Building Progress Passed
04/28/2025 ENGR Engineering Final Passed CO REDAY
04/28/2025 COT - RSEL - Outdoor Lighting Passed
04/30/2025 COT - RSEL - Electrical Final Passed
04/30/2025 COT - RSME - Mechanical Final Passed
04/30/2025 COT - RSPL - Plumbing Final Passed
04/30/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720- G VALENCIA CROSSING LL - LOT 129 - PT REPORT-2025-04-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 129 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 129 SPECIAL INSPECTION CERTIFICATE-2024-10-15_V1.PDF DOCUMENTS VIEW