Permit Details

Status:
Issued
Type:
Model Building Permit
Address:
7415 S KELLER LN
Apply Date:
12/15/2023
Applicant:
Joshua Swinney
Description:
Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)

Permit Reviews

Permit Number - TC-MDP-1023-01706
Permit Status: Issued
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Start Date Submittal Complete Date Status  
12/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2023 APPROVED Review Details
11/21/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/22/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01706
Permit Status: Issued
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Date Description Comments
11/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/19/2023 Post-Tension Inspection Report is required.
10/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/19/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1023-01706
Permite Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/29/2024 COT - BULD - SWG Clearance N/A Not Applicable Not Applicable for this subdivision. No gas appliances in these houses.
07/29/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not Applicable for this subdivision. No gas appliances in these houses.
11/15/2024 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1023-01706
Permit Description: Indiana Dunes Model Plan La Escalera (Model master plan TC-MDP-1222-00130)
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/11/2024 COT - RSPL - Backwater Valve Passed
04/11/2024 COT - RSPL - Rough Soil Passed
04/11/2024 COT - RSPL - Yard Water Line Passed
04/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
06/06/2024 COT - RSBU - Roof Nailing Passed
07/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
08/13/2024 COT - RSBU - Exterior Clips/Sheathing Passed 8/13/2024 approved per Ralph Mellecker.
08/13/2024 COT - RSBU - Interior Shear Bracing Passed
09/18/2024 COT - RSPL - Sewer Passed
09/20/2024 RSBU - Building Progress Passed 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line
09/20/2024 BULD - Electrical Clearance Passed TEP ECO
11/15/2024 COT - RSEL - Outdoor Lighting Passed 11-15-24, approved
11/19/2024 ENGR Engineering Final Passed CO Ready
11/20/2024 COT - RSEL - Electrical Final Passed 11-20-24, listed items from previous inspection have been corrected. Mechanical, outdoor lighting, plumbing, electrical and building final approved.
11/20/2024 COT - RSME - Mechanical Final Passed 11-20-24, listed items from previous inspection have been corrected. Mechanical, outdoor lighting, plumbing, electrical and building final approved.
11/20/2024 COT - RSPL - Plumbing Final Passed 11-20-24, listed items from previous inspection have been corrected. Mechanical, outdoor lighting, plumbing, electrical and building final approved.
11/20/2024 RSBU - Building Final Passed 11-20-24, listed items from previous inspection have been corrected. Mechanical, outdoor lighting, plumbing, electrical and building final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 210 PLOT PLAN_V1.PDF DOCUMENTS VIEW