Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
2739 S AYALA ST
Address NEW:
2739 S AYALA ST
Apply Date:
01/20/2026
Applicant:
Mark Alteri
Description:
PV 1074 SFR (Model master plan TC-MDP-0124-00022)

Permit Reviews

Permit Number - TC-MDP-0925-00554
Permit Status: Inspections complete
Permit Description: PV 1074 SFR (Model master plan TC-MDP-0124-00022)
Start Date Submittal Complete Date Status  
07/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/15/2026 APPROVED Review Details
01/23/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/30/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0925-00554
Permit Status: Inspections complete
Permit Description: PV 1074 SFR (Model master plan TC-MDP-0124-00022)
Date Description Comments
07/15/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/18/2025 Post-Tension Inspection Report is required.
09/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/18/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00554
Permite Description: PV 1074 SFR (Model master plan TC-MDP-0124-00022)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/12/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 3-12-26: add shots pins at marked locations, add nailing to exterior sheathing above garage, missing 3-3/8"x5" lad screws at back patio-see SD3.1 Detail 16. Plans call for a 2x8 continuous rim on east exterior wall of kitchen door -a 2x6 was used with a 2" trim. Stopped inspection -additional items may be added. Also, provide a ladder to inspect roof, cs 16 straps missing at inside of back patio doors-see sd3.1& sd2/detail 1.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00554
Permit Description: PV 1074 SFR (Model master plan TC-MDP-0124-00022)
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/13/2026 COT - RSPL - Rough Soil Passed Passed 2/12/26
02/13/2026 COT - RSPL - Sewer Passed Passed 2/12/26
02/13/2026 COT - RSPL - Yard Water Line Passed Passed 2/12/26
02/25/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
02/25/2026 COT - RSBU - Preslab Passed Ensure slab area is termite treated.
02/25/2026 COT - RSEL - Electrical Underground Passed
03/17/2026 COT - RSBU - Roof Nailing Passed 3/17/2026
Corrections made to prior inspection. Walked rest of house, verified roof nailing and truss calcs.
03/17/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3/17/2026
Corrections made to prior inspection. Walked rest of house, verified roof nailing and truss calcs.
04/22/2026 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/22/2026
04/22/2026 COT - RSPL - Gas Pressure Test Passed
04/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed All corrections were made. 4/27/2026
05/05/2026 COT - RSBU - Interior Shear Bracing Passed 05/05/2026
Approved per plan, verified shearwall nail schedule.
06/30/2026 COT - BULD - SWG Clearance Passed 06/30/2026
Approved clearance for SWG.
07/08/2026 RSBU - Building Final Passed
07/08/2026 RSBU - Building Progress Passed
07/08/2026 COT - RSPL - Plumbing Final Passed
07/08/2026 COT - RSME - Mechanical Final Passed
07/08/2026 COT - RSEL - Outdoor Lighting Passed
07/08/2026 COT - RSEL - Electrical Final Passed
07/20/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans and all 'prior to final' conditions have been satisfied.

Documents

File Name Document Type  
PT REPORT LOT 28-2026-07-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
PRL 28 PT CERT-2026-01-20_V1.PDF DOCUMENTS VIEW
PRL PP FOR SUBMITTAL_V1.PDF DOCUMENTS VIEW