Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9851 E KIARA PEAK WY
Apply Date:
03/24/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)

Permit Reviews

Permit Number - TC-MDP-0925-00524
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Start Date Submittal Complete Date Status  
03/26/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/08/2026 APPROVED Review Details
08/24/2026 SPECIAL INSPECTION REVIEW v.1 08/25/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0925-00524
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Date Description Comments
09/02/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
03/27/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/02/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/27/2026 Post-Installed Anchor Inspection Report is required.
09/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/27/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00524
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/28/2026 COT - BULD - SWG Clearance N/A Not Ready
08/13/2026 COT - RSEL - Electrical Final N/A Re-inspection required 8-13-26 Bedroom 2 smoke detector shall be a minimum of 4" away from wall needs to comply with NFPA 72*missing post tension tag at hose bib* primary bathroom countertop switch closest to mirror left of entry door furthest from door on plan shows as optional seeing that it wasn't used for that option. It should be blanked.* all thermostats are required to be at 48 inches if controls are at bottom then 48 inches to bottom is OK * please provide tall enough ladder for attic access.
08/13/2026 COT - RSME - Mechanical Final N/A Re-inspection required 8-13-26 Bedroom 2 smoke detector shall be a minimum of 4" away from wall needs to comply with NFPA 72*missing post tension tag at hose bib* primary bathroom countertop switch closest to mirror left of entry door furthest from door on plan shows as optional seeing that it wasn't used for that option. It should be blanked.* all thermostats are required to be at 48 inches if controls are at bottom then 48 inches to bottom is OK * please provide tall enough ladder for attic access.
08/13/2026 COT - RSPL - Plumbing Final N/A Re-inspection required 8-13-26 Bedroom 2 smoke detector shall be a minimum of 4" away from wall needs to comply with NFPA 72*missing post tension tag at hose bib* primary bathroom countertop switch closest to mirror left of entry door furthest from door on plan shows as optional seeing that it wasn't used for that option. It should be blanked.* all thermostats are required to be at 48 inches if controls are at bottom then 48 inches to bottom is OK * please provide tall enough ladder for attic access.
08/13/2026 RSBU - Building Final N/A Re-inspection required 8-13-26 Bedroom 2 smoke detector shall be a minimum of 4" away from wall needs to comply with NFPA 72*missing post tension tag at hose bib* primary bathroom countertop switch closest to mirror left of entry door furthest from door on plan shows as optional seeing that it wasn't used for that option. It should be blanked.* all thermostats are required to be at 48 inches if controls are at bottom then 48 inches to bottom is OK * please provide tall enough ladder for attic access.
08/19/2026 ENGR Engineering Final N/A Partial Pass Drainage issues have been corrected. Threshold has been passed with the Building Final.
Outstanding conditions need to be signed off by the City.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00524
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/23/2026 COT - RSPL - Backwater Valve Passed
04/23/2026 COT - RSPL - Rough Soil Passed 04/23/2026
Per plan and holding under water test in clear trench with slope. Okay to backfill, shading required.
04/23/2026 COT - RSPL - Yard Water Line Passed 04/23/2026
Holding under air test with blue tracer wire to riser. Okay to backfill, shading required.
04/30/2026 COT - RSEL - Electrical Underground Passed
05/01/2026 COT - RSBU - Preslab Passed 05/01/2026
Corrections made. Okay for concrete placement.
05/01/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 05/01/2026
Corrections made. Okay for concrete placement.
05/14/2026 COT - RSBU - Roof Nailing Passed
05/18/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/28/2026 BULD - Electrical Clearance Passed 5/28/26
TEP CLEARANCE: ECO
05/28/2026 COT - RSEL - Grounding/Bonding Passed
05/28/2026 COT - RSPL - Gas Pressure Test Passed
06/01/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/22/2026 COT - RSPL - Sewer Passed
06/22/2026 COT - RSBU - Interior Shear Bracing Passed
08/06/2026 COT - BULD - SWG Clearance Passed 8-6-26: okay to install gas meter-SWG clearance issued.
08/07/2026 COT - RSEL - Outdoor Lighting Passed
08/07/2026 RSBU - Building Progress Passed
08/17/2026 COT - RSEL - Electrical Final Passed 8-17-26: electrical final approved.
08/17/2026 COT - RSME - Mechanical Final Passed 8-17-26: mechanical final approved.
08/17/2026 COT - RSPL - Plumbing Final Passed 8-17-26: plumbing final approved.
09/11/2026 RSBU - Building Final Passed
09/11/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
PT PACKET- MRS 164-2026-08-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 164 START_V1.PDF DOCUMENTS VIEW
MRS 164 SIC-2026-03-24_V1.PDF DOCUMENTS VIEW