Permit: TC-MDP-0925-00519
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
9985 E LEBARON DR
Address NEW:
9985 E LEBARON DR
Apply Date:
02/10/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Permit Reviews
Permit Number - TC-MDP-0925-00519
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00519
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/19/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/19/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 02/19/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 09/02/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 09/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0925-00519
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Date | Description | Comments |
|---|---|---|
| 09/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0925-00519
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 04/08/2026 Provide underground conduit to kitchen island per plan, wrap greywater DWV pipe on north wall running through footing for protection. |
| 04/08/2026 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 04/08/2026 Provide underground conduit to kitchen island per plan, wrap greywater DWV pipe on north wall running through footing for protection. |
| 04/08/2026 | COT - RSBU - Preslab | N/A | Re-inspection required | 04/08/2026 Provide underground conduit to kitchen island per plan, wrap greywater DWV pipe on north wall running through footing for protection. |
| 07/15/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 7/15/26: clean out must be cut to grade and capped, knock out at main panel must be sealed, panel schedule must be legible (marker is fading away at multiple circuits at panel), (2) AFCI circuits at panel keep tripping, PRV must be properly terminated ( no more than 6" AFF), weep screed clearance from grade shall be no less the 4", post tension tag required at hose bib, refrigerant caps missing at hvac condenser, non-metallic piping required to be marked at panel, receptacles must be re-checked due to circuits being off (multiple receptacles dead throughout), light fixtures in master bathroom not properly functioning, garbage disposal switch must be properly mounted, receptacles in laundry room must be GFCI, dryer box must display duct run on label, accessible door in garage has non compliant threshold, remove paint off 20-minute fire rated door at garage, garage door shall be self latching, properly support b-vent off of truss 6" min for single wall pipe, |
| 07/15/2026 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 7/15/26: clean out must be cut to grade and capped, knock out at main panel must be sealed, panel schedule must be legible (marker is fading away at multiple circuits at panel), (2) AFCI circuits at panel keep tripping, PRV must be properly terminated ( no more than 6" AFF), weep screed clearance from grade shall be no less the 4", post tension tag required at hose bib, refrigerant caps missing at hvac condenser, non-metallic piping required to be marked at panel, receptacles must be re-checked due to circuits being off (multiple receptacles dead throughout), light fixtures in master bathroom not properly functioning, garbage disposal switch must be properly mounted, receptacles in laundry room must be GFCI, dryer box must display duct run on label, accessible door in garage has non compliant threshold, remove paint off 20-minute fire rated door at garage, garage door shall be self latching, properly support b-vent off of truss 6" min for single wall pipe, |
| 07/15/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 7/15/26: clean out must be cut to grade and capped, knock out at main panel must be sealed, panel schedule must be legible (marker is fading away at multiple circuits at panel), (2) AFCI circuits at panel keep tripping, PRV must be properly terminated ( no more than 6" AFF), weep screed clearance from grade shall be no less the 4", post tension tag required at hose bib, refrigerant caps missing at hvac condenser, non-metallic piping required to be marked at panel, receptacles must be re-checked due to circuits being off (multiple receptacles dead throughout), light fixtures in master bathroom not properly functioning, garbage disposal switch must be properly mounted, receptacles in laundry room must be GFCI, dryer box must display duct run on label, accessible door in garage has non compliant threshold, remove paint off 20-minute fire rated door at garage, garage door shall be self latching, properly support b-vent off of truss 6" min for single wall pipe, |
| 07/15/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 7/15/26: clean out must be cut to grade and capped, knock out at main panel must be sealed, panel schedule must be legible (marker is fading away at multiple circuits at panel), (2) AFCI circuits at panel keep tripping, PRV must be properly terminated ( no more than 6" AFF), weep screed clearance from grade shall be no less the 4", post tension tag required at hose bib, refrigerant caps missing at hvac condenser, non-metallic piping required to be marked at panel, receptacles must be re-checked due to circuits being off (multiple receptacles dead throughout), light fixtures in master bathroom not properly functioning, garbage disposal switch must be properly mounted, receptacles in laundry room must be GFCI, dryer box must display duct run on label, accessible door in garage has non compliant threshold, remove paint off 20-minute fire rated door at garage, garage door shall be self latching, properly support b-vent off of truss 6" min for single wall pipe, |
| 07/15/2026 | ENGR Engineering Final | N/A | Not Ready | HCS clean out needs to be trimmed. Outstanding conditions need to be satisfied prior to final: -Air leakage and duct tightness -Concrete installation -Epoxy anchors -Post tension slab -Site preparation |
| 07/15/2026 | RSBU - Building Final | N/A | Re-inspection required | 7/15/26: clean out must be cut to grade and capped, knock out at main panel must be sealed, panel schedule must be legible (marker is fading away at multiple circuits at panel), (2) AFCI circuits at panel keep tripping, PRV must be properly terminated ( no more than 6" AFF), weep screed clearance from grade shall be no less the 4", post tension tag required at hose bib, refrigerant caps missing at hvac condenser, non-metallic piping required to be marked at panel, receptacles must be re-checked due to circuits being off (multiple receptacles dead throughout), light fixtures in master bathroom not properly functioning, garbage disposal switch must be properly mounted, receptacles in laundry room must be GFCI, dryer box must display duct run on label, accessible door in garage has non compliant threshold, remove paint off 20-minute fire rated door at garage, garage door shall be self latching, properly support b-vent off of truss 6" min for single wall pipe, |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0925-00519
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2026 | COT - RSPL - Rough Soil | Passed | 03/20/2026 Holding under test. Ok to backfill, shading required. |
|
| 03/23/2026 | COT - RSPL - Yard Water Line | Passed | 3/23/26 CORRECTIONS MADE | |
| 04/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/08/2026 Approved per plan, all corrections made. Okay to proceed. |
|
| 04/08/2026 | COT - RSEL - Electrical Underground | Passed | 04/08/2026 Approved per plan, all corrections made. Okay to proceed. |
|
| 04/08/2026 | COT - RSBU - Preslab | Passed | 04/08/2026 Approved per plan, all corrections made. Okay to proceed. |
|
| 04/17/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/17/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/07/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/07/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/19/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/17/2026 | BULD - Electrical Clearance | Passed | ||
| 06/17/2026 | COT - RSPL - Sewer | Passed | ||
| 07/10/2026 | COT - BULD - SWG Clearance | Passed | 7-10-2026 SWG Clearance approved. | |
| 07/15/2026 | RSBU - Building Progress | Passed |