Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | ENGR Engineering Final | Not Ready | HCS clean out needs to be trimmed. Outstanding conditions need to be satisfied prior to final: -Air leakage and duct tightness -Concrete installation -Epoxy anchors -Post tension slab -Site preparation |