Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
09/09/2025
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)

Permit Reviews

Permit Number - TC-MDP-0925-00518
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Start Date Submittal Complete Date Status  
09/16/2025 RESTAMP - RESIDENTIAL v.1 09/16/2025 APPROVED Review Details
09/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 09/16/2025 APPROVED Review Details
09/09/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/15/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0925-00518
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Activity Conditions - 7
Date Name
09/02/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
09/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/09/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
09/09/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0925-00518
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Date Description Comments
09/02/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0925-00518
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/19/2025 COT - RSPL - Sewer N/A Not Ready 9.19.2025
Not ready.
09/19/2025 COT - RSPL - Yard Water Line N/A Not Ready 9.19.2025
Not ready.
09/23/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial pass UFER
01/20/2026 COT - RSEL - Electrical Final N/A Re-inspection required 1/20/26: secure conduit at hose bib, insulation required at exterior hose bib, pt tag required at exterior hose bib, cleanouts must be cut to grade, caulking required at toilets,label at dryer vent must be filled out,post tension stamp at garage required, hvac equipment vandalized, accessible route non-compliance,please recall when ready, accessible route does not meet requirements, no attic access, no garage access, domestic water has not been hooked up, sewer connection has not been made, expansion tank required at water heater due to a closed loop system. Stopped inspection more items may be added. Please call future inspections under commercial permit for sales office and model home (this permit is directly correlated with the SFR)
01/20/2026 COT - RSME - Mechanical Final N/A Re-inspection required 1/20/26: secure conduit at hose bib, insulation required at exterior hose bib, pt tag required at exterior hose bib, cleanouts must be cut to grade, caulking required at toilets,label at dryer vent must be filled out,post tension stamp at garage required, hvac equipment vandalized, accessible route non-compliance,please recall when ready, accessible route does not meet requirements, no attic access, no garage access, domestic water has not been hooked up, sewer connection has not been made, expansion tank required at water heater due to a closed loop system. Stopped inspection more items may be added. Please call future inspections under commercial permit for sales office and model home (this permit is directly correlated with the SFR)
01/20/2026 ENGR Engineering Final N/A Not Ready No accessible route present as required by inclusive home design ordinance. cut and cap cleanouts. remove extra roof tiles. ensure pedestrian circulation from sales office meets all requirements of ICC A117.1
01/20/2026 RSBU - Building Final N/A Re-inspection required 1/20/26: secure conduit at hose bib, insulation required at exterior hose bib, pt tag required at exterior hose bib, cleanouts must be cut to grade, caulking required at toilets,label at dryer vent must be filled out,post tension stamp at garage required, hvac equipment vandalized, accessible route non-compliance,please recall when ready, accessible route does not meet requirements, no attic access, no garage access, domestic water has not been hooked up, sewer connection has not been made, expansion tank required at water heater due to a closed loop system. Stopped inspection more items may be added. Please call future inspections under commercial permit for sales office and model home (this permit is directly correlated with the SFR)

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0925-00518
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 13
Date Description Inspector Results Comments
09/19/2025 COT - RSPL - Rough Soil Passed 9.19.2025
Okay to backfill, shading required. Green tracer wire required on sewer pipe outside.
09/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/23/2025 COT - RSBU - Preslab Passed
09/23/2025 COT - RSEL - Electrical Underground Passed
09/30/2025 COT - RSBU - Roof Nailing Passed
10/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-8-25: intermediates approved-okay to continue with construction.
10/08/2025 COT - RSPL - Gas Pressure Test Passed 10-8-25: gas pressure test approved.
10/13/2025 COT - RSBU - Interior Shear Bracing Passed
01/08/2026 COT - RSEL - Grounding/Bonding Passed 01/08/2026
Tied into MSP.
01/08/2026 BULD - Electrical Clearance Passed 01/08/2026
Clearance for TEP ECO.
01/08/2026 COT - BULD - SWG Clearance Passed 01/08/2026
Clearance for Southwest Gas.
01/08/2026 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MRS 103 SIC-2025-09-09_V1.PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 103 START_V2.PDF DOCUMENTS VIEW