Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/2026 |
ENGR Engineering Final
|
|
Not Ready |
No accessible route present as required by inclusive home design ordinance. cut and cap cleanouts. remove extra roof tiles. ensure pedestrian circulation from sales office meets all requirements of ICC A117.1 |