Permit: TC-MDP-0924-01098
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6813 E PASEO DON OCTAVIO
Address NEW:
6813 E PASEO DON OCTAVIO
Apply Date:
09/23/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600
Permit Reviews
Permit Number - TC-MDP-0924-01098
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 09/25/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/01/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01098
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Date | Description | Comments |
|---|---|---|
| 10/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/27/2024 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01098
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 05/05/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 05/05/2025 | RSBU - Building Final | N/A | Re-inspection required | 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 05/05/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 05/05/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01098
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | COT - RSPL - Rough Soil | Passed | 1/29/25 pass OK to backfill, shading required. | |
| 01/29/2025 | COT - RSPL - Sewer | Passed | 1/29/25 pass OK to backfill, shading required. | |
| 01/29/2025 | COT - RSPL - Yard Water Line | Passed | 1/29/25 pass OK to backfill, shading required. | |
| 02/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2/4/25 pass | |
| 02/04/2025 | COT - RSBU - Preslab | Passed | 2/4/25 pass | |
| 02/04/2025 | COT - RSEL - Electrical Underground | Passed | 2/4/25 pass | |
| 02/04/2025 | COT - RSEL - Grounding/Bonding | Passed | 2/4/24 partial pass, ufer is anchored to footing. Ok to pour. | |
| 02/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/20/25 corrections made pass | |
| 02/20/2025 | COT - RSBU - Roof Nailing | Passed | 2/20/25 pass | |
| 02/28/2025 | BULD - Electrical Clearance | Passed | 28 FEB 25 TEP CLEARANCE:ECO |
|
| 02/28/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4 March 25 Pass |
|
| 03/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/05/2025 | COT - BULD - SWG Clearance | Passed | 4-23-25, no access. Front door locked and there's a sign at the garage door that says, "don't enter-wet tile." 5/5/25: SWG CLEARANCE |
|
| 05/05/2025 | RSBU - Building Progress | Passed | ||
| 05/09/2025 | COT - RSPL - Plumbing Final | Passed | 5/9/2025 approved. | |
| 05/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 5/9/2025 approved. | |
| 05/13/2025 | RSBU - Building Final | Passed | 5/13/25 Pass |
|
| 05/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/13/2025 | COT - RSME - Mechanical Final | Passed | 5/13/25 Pass |
|
| 05/16/2025 | ENGR Engineering Final | Passed | CO Ready |