Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/23/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600

Permit Reviews

Permit Number - TC-MDP-0924-01098
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Start Date Submittal Complete Date Status  
03/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/14/2025 APPROVED Review Details
09/25/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01098
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Date Description Comments
10/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01098
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/05/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
05/05/2025 COT - RSEL - Outdoor Lighting N/A Re-inspection required 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
05/05/2025 RSBU - Building Final N/A Re-inspection required 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
05/05/2025 COT - RSEL - Electrical Final N/A Re-inspection required 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
05/05/2025 COT - RSME - Mechanical Final N/A Re-inspection required 5/5/25: clean out at driveway missing. SWG meter not installed, Non metallic piping label required at main panel, label for future solar equipment required at main panel, 3” clearance for grade at A/C condenser required, A/C disconnect box most be properly secured and all unused knockouts must be sealed, post tension tag required at hose bib, gate required at CMU wall, thermostat shall be no higher than 48” above finish floor, Garage receptacles must be GFCI, no attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01098
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/29/2025 COT - RSPL - Rough Soil Passed 1/29/25 pass OK to backfill, shading required.
01/29/2025 COT - RSPL - Sewer Passed 1/29/25 pass OK to backfill, shading required.
01/29/2025 COT - RSPL - Yard Water Line Passed 1/29/25 pass OK to backfill, shading required.
02/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/4/25 pass
02/04/2025 COT - RSBU - Preslab Passed 2/4/25 pass
02/04/2025 COT - RSEL - Electrical Underground Passed 2/4/25 pass
02/04/2025 COT - RSEL - Grounding/Bonding Passed 2/4/24 partial pass, ufer is anchored to footing. Ok to pour.
02/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/20/25 corrections made pass
02/20/2025 COT - RSBU - Roof Nailing Passed 2/20/25 pass
02/28/2025 BULD - Electrical Clearance Passed 28 FEB 25
TEP CLEARANCE:ECO
02/28/2025 COT - RSPL - Gas Pressure Test Passed
03/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4 March 25
Pass
03/14/2025 COT - RSBU - Interior Shear Bracing Passed
05/05/2025 COT - BULD - SWG Clearance Passed 4-23-25, no access. Front door locked and there's a sign at the garage door that says, "don't enter-wet tile."
5/5/25: SWG CLEARANCE
05/05/2025 RSBU - Building Progress Passed
05/09/2025 COT - RSPL - Plumbing Final Passed 5/9/2025 approved.
05/09/2025 COT - RSEL - Outdoor Lighting Passed 5/9/2025 approved.
05/13/2025 RSBU - Building Final Passed 5/13/25
Pass
05/13/2025 COT - RSEL - Electrical Final Passed
05/13/2025 COT - RSME - Mechanical Final Passed 5/13/25
Pass
05/16/2025 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
153226 PT LOT 80 COMPLETE-2025-03-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 80 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 80 SPECIAL INSPECTION CERTIFICATE-2024-09-23_V1.PDF DOCUMENTS VIEW