Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
10/21/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600

Permit Reviews

Permit Number - TC-MDP-0924-01094
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Start Date Submittal Complete Date Status  
04/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/28/2025 APPROVED Review Details
10/24/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01094
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Date Description Comments
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/28/2024 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01094
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/10/2025 COT - RSPL - Gas Pressure Test N/A Not Ready
06/05/2025 COT - RSEL - Electrical Final N/A Re-inspection required 6/5/25: garbage disposal circuit tied into kitchen island, exterior plastic piping must be coated, support electrical whip at hvac, 3" clearance required at A/C condenser, 3'clearance required from regulator vent to electrical panel, Post tension stamp cannot be read, 20 min label at garage door is painted over, attic access ladder must be appropriate height. All receptacles in laundry room must be GFCI.
06/05/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 6/5/25: garbage disposal circuit tied into kitchen island, exterior plastic piping must be coated, support electrical whip at hvac, 3" clearance required at A/C condenser, 3'clearance required from regulator vent to electrical panel, Post tension stamp cannot be read, 20 min label at garage door is painted over, attic access ladder must be appropriate height. All receptacles in laundry room must be GFCI.
06/05/2025 RSBU - Building Final N/A Re-inspection required 6/5/25: garbage disposal circuit tied into kitchen island, exterior plastic piping must be coated, support electrical whip at hvac, 3" clearance required at A/C condenser, 3'clearance required from regulator vent to electrical panel, Post tension stamp cannot be read, 20 min label at garage door is painted over, attic access ladder must be appropriate height. All receptacles in laundry room must be GFCI.
06/05/2025 COT - RSME - Mechanical Final N/A Re-inspection required 6/5/25: garbage disposal circuit tied into kitchen island, exterior plastic piping must be coated, support electrical whip at hvac, 3" clearance required at A/C condenser, 3'clearance required from regulator vent to electrical panel, Post tension stamp cannot be read, 20 min label at garage door is painted over, attic access ladder must be appropriate height. All receptacles in laundry room must be GFCI.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01094
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/06/2025 COT - RSPL - Rough Soil Passed 6 Mar 25
Pass
03/06/2025 COT - RSPL - Sewer Passed 6 Mar 25
Pass
03/06/2025 COT - RSPL - Yard Water Line Passed 6 Mar 25
Pass
03/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/14/2025 COT - RSBU - Preslab Passed
03/18/2025 COT - RSEL - Electrical Underground Passed Passed ok to pour concrete 3/18/25
03/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/27/2025 COT - RSBU - Roof Nailing Passed
04/10/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/10/2025
04/10/2025 COT - RSEL - Grounding/Bonding Passed
04/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/11/2025 COT - RSPL - Gas Pressure Test Passed 4/11/25
Pass
04/24/2025 COT - RSBU - Interior Shear Bracing Passed 4-24-25, interior shear bracing inspection approved. Okay to tape & texture drywall.
06/02/2025 COT - BULD - SWG Clearance Passed 6/2/25
Southwest gas clearance: SWG
06/05/2025 COT - RSEL - Outdoor Lighting Passed
06/05/2025 ENGR Engineering Final Passed Back yard gate is missing.
06/05/2025 RSBU - Building Progress Passed
06/10/2025 COT - RSEL - Electrical Final Passed 6-10-25: electrical final approved.
06/12/2025 COT - RSPL - Plumbing Final Passed 6-12-25: plumbing final approved.
06/12/2025 RSBU - Building Final Passed 6-12-25: corrections made-building final approved.
06/17/2025 COT - RSME - Mechanical Final Passed 6/17/2025 approved. Corrections have been made.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
154096 PT LOT 9 COMPLETE-2025-04-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 9 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 9 SPECIAL INSPECTION CERTIFICATE-2024-10-21_V1.PDF DOCUMENTS VIEW