Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2025 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
6/5/25: garbage disposal circuit tied into kitchen island, exterior plastic piping must be coated, support electrical whip at hvac, 3" clearance required at A/C condenser, 3'clearance required from regulator vent to electrical panel, Post tension stamp cannot be read, 20 min label at garage door is painted over, attic access ladder must be appropriate height. All receptacles in laundry room must be GFCI. |
| 06/10/2025 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
6-10-25: 3" clearance required at a/c condenser, a metal plaque must be permanently mounted on the inside of the garage indicating "post tension slab-do not to be cut." See note from previous inspection related to regulator clearance to panel |
| 06/12/2025 |
COT - RSPL - Plumbing Final |
|
Passed |
6-12-25: plumbing final approved. |