Permit: TC-MDP-0924-01093
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6770 E VIA DEL CANTILLO
Address NEW:
6770 E VIA DEL CANTILLO
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600
Permit Reviews
Permit Number - TC-MDP-0924-01093
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/12/2025 | APPROVED |
| 01/15/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/23/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01093
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Date | Description | Comments |
|---|---|---|
| 01/23/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 01/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/15/2025 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 01/15/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01093
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Provide plans on site prior to inspection. 4/10/2025 |
| 04/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | Provide plans on site prior to inspection. 4/10/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01093
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2025 | COT - RSPL - Rough Soil | Passed | 3/21/25 passed ok to backfill | |
| 03/21/2025 | COT - RSPL - Sewer | Passed | 3/21/25 passed ok to backfill | |
| 03/21/2025 | COT - RSPL - Yard Water Line | Passed | 3/21/25 passed ok to backfill | |
| 03/26/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/26/2025 | COT - RSBU - Preslab | Passed | ||
| 03/26/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 03/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/11/2025 | COT - RSBU - Roof Nailing | Passed | 4/11/25 Pass |
|
| 04/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/16/25 Pass |
|
| 04/23/2025 | COT - RSPL - Gas Pressure Test | Passed | 4-23-25, gas pressure test approved. | |
| 04/24/2025 | BULD - Electrical Clearance | Passed | 4-24-25, panel is okay to be energized. ECO clearance issued to TEP. | |
| 04/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/11/2025 | COT - BULD - SWG Clearance | Passed | 6-11-25: approved for SWG to install meter. Clearance issued. | |
| 06/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/20/2025 | ENGR Engineering Final | Passed | Site is clean and safe, in accordance with approved plans. CofO ready. | |
| 06/20/2025 | RSBU - Building Progress | Passed | ||
| 06/27/2025 | COT - RSEL - Electrical Final | Passed | 6/27/2025 all corrections have been made. | |
| 06/27/2025 | COT - RSME - Mechanical Final | Passed | 6/27/2025 all corrections have been made. | |
| 06/27/2025 | COT - RSPL - Plumbing Final | Passed | 6/27/2025 all corrections have been made. | |
| 06/27/2025 | RSBU - Building Final | Passed | 6/27/2025 all corrections have been made. |