Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600

Permit Reviews

Permit Number - TC-MDP-0924-01093
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Start Date Submittal Complete Date Status  
05/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/12/2025 APPROVED Review Details
01/15/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01093
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Date Description Comments
01/23/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
01/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/15/2025 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/15/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01093
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/10/2025 COT - RSBU - Roof Nailing N/A Re-inspection required Provide plans on site prior to inspection. 4/10/2025
04/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Provide plans on site prior to inspection. 4/10/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01093
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/21/2025 COT - RSPL - Rough Soil Passed 3/21/25 passed ok to backfill
03/21/2025 COT - RSPL - Sewer Passed 3/21/25 passed ok to backfill
03/21/2025 COT - RSPL - Yard Water Line Passed 3/21/25 passed ok to backfill
03/26/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2025 COT - RSBU - Preslab Passed
03/26/2025 COT - RSEL - Electrical Underground Passed
03/26/2025 COT - RSEL - Grounding/Bonding Passed
04/11/2025 COT - RSBU - Roof Nailing Passed 4/11/25
Pass
04/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/16/25
Pass
04/23/2025 COT - RSPL - Gas Pressure Test Passed 4-23-25, gas pressure test approved.
04/24/2025 BULD - Electrical Clearance Passed 4-24-25, panel is okay to be energized. ECO clearance issued to TEP.
04/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/09/2025 COT - RSBU - Interior Shear Bracing Passed
06/11/2025 COT - BULD - SWG Clearance Passed 6-11-25: approved for SWG to install meter. Clearance issued.
06/20/2025 COT - RSEL - Outdoor Lighting Passed
06/20/2025 ENGR Engineering Final Passed Site is clean and safe, in accordance with approved plans. CofO ready.
06/20/2025 RSBU - Building Progress Passed
06/27/2025 COT - RSEL - Electrical Final Passed 6/27/2025 all corrections have been made.
06/27/2025 COT - RSME - Mechanical Final Passed 6/27/2025 all corrections have been made.
06/27/2025 COT - RSPL - Plumbing Final Passed 6/27/2025 all corrections have been made.
06/27/2025 RSBU - Building Final Passed 6/27/2025 all corrections have been made.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
154251 PT LOT 90 COMPLETE-2025-05-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 90 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 90 SPECIAL INSPECTION CERTIFICATE-2025-01-06_V1.PDF DOCUMENTS VIEW