Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence plan 230.2690

Permit Reviews

Permit Number - TC-MDP-0924-01088
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
Start Date Submittal Complete Date Status  
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2025 APPROVED Review Details
01/15/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01088
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
Date Description Comments
01/23/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
01/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/15/2025 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/15/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01088
Permite Description: Single Family Residence plan 230.2690
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/19/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 5/16/25
Not ready

5/19/25
1. Garage header is missing 1 king stud on each end.
2. Studs are broken at stairs, see marking in red.
3. Fire blocking needed at stringers, see stinger details.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01088
Permit Description: Single Family Residence plan 230.2690
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/23/2025 COT - RSPL - Yard Water Line Passed 4-23-25, main water line inspection approved. Okay to backfill with shading materials.
04/24/2025 COT - RSPL - Rough Soil Passed 4-24-25, underground plumbing verified per plans-okay to backfill with shading materials.
05/01/2025 COT - RSPL - Sewer Passed
05/06/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/06/2025 COT - RSBU - Preslab Passed
05/06/2025 COT - RSEL - Electrical Underground Passed
05/30/2025 COT - RSBU - Roof Nailing Passed 5-30-25, approved. Okay to dry-in roof.
06/02/2025 BULD - Electrical Clearance Passed 6/2/25
TEP CLEARANCE: ECO
06/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/2/25
Pass
06/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/02/2025 COT - RSPL - Gas Pressure Test Passed
06/12/2025 COT - RSEL - Grounding/Bonding Passed 6-12-25: bonding/grounding approved.
06/12/2025 COT - RSBU - Interior Shear Bracing Passed 6-12-25: interior shear bracing approved. Okay for tape & texture.
07/25/2025 ENGR Engineering Final Passed Site is clean and accessible, built in accordance with approved plans.
07/29/2025 COT - RSEL - Electrical Final Passed 7.29.25
Passed
07/29/2025 COT - RSEL - Outdoor Lighting Passed 7.29.25
Passed
07/29/2025 COT - RSME - Mechanical Final Passed 7.29.25
Passed
07/29/2025 COT - RSPL - Plumbing Final Passed 7.29.25
All plumbing elements verified
07/29/2025 RSBU - Building Final Passed 7.29.25
Passed
07/29/2025 RSBU - Building Progress Passed 7.29.25
08/04/2025 COT - BULD - SWG Clearance Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
154956 PT LOT 92 COMPLETE-2025-06-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 92 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 92 SPECIAL INSPECTION CERTIFICATE-2025-01-06_V1.PDF DOCUMENTS VIEW