Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
921 E 36TH ST
Address NEW:
921 E 36TH ST
Apply Date:
09/19/2024
Applicant:
Ana Chavez
Description:
duplex model plan (Model master plan TC-MDP-0824-00864)

Permit Reviews

Permit Number - TC-MDP-0924-01052
Permit Status: Complete
Permit Description: duplex model plan (Model master plan TC-MDP-0824-00864)
Start Date Submittal Complete Date Status  
01/14/2025 RESTAMP - RESIDENTIAL v.1 01/19/2025 APPROVED Review Details
10/01/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/10/2024 REQUIRES RESUBMIT Review Details
09/24/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/24/2024 REQUIRES RESUBMIT Review Details
12/19/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 01/09/2025 REQUIRES RESUBMIT Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2025 APPROVED Review Details
01/13/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 01/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01052
Permit Status: Complete
Permit Description: duplex model plan (Model master plan TC-MDP-0824-00864)
Date Description Comments
01/13/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION.
02/07/2025 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01052
Permite Description: duplex model plan (Model master plan TC-MDP-0824-00864)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/28/2025 COT - RSBU - Preslab and floodplain N/A Partial Pass 1/28/25: floodplain certification has not been approved. Pending approval. Reinforcement per plan.
04/17/2025 COT - BULD - SWG Clearance N/A Not Applicable 4-17-25, not applicable
04/17/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 4-17-25, not applicable
02/07/2025 COT - RSBU - Interior Shear Bracing N/A Partial Pass 2/7/25 we will need to see the gypsum board before taping. Partial

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01052
Permit Description: duplex model plan (Model master plan TC-MDP-0824-00864)
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/22/2025 COT - RSPL - Rough Soil Passed Passed 1/22/25 ok to backfill
01/28/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/28/25: floodplain certification has not been approved. Pending approval. Reinforcement per plan.
01/31/2025 COT - RSBU - Preslab and floodplain Passed 1/31/25: approved by J. Garcia
02/07/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/7/25 pass
02/07/2025 COT - RSBU - Roof Nailing Passed 2/7/25 pass
02/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and cover walls.
02/14/2025 COT - RSPL - Yard Water Line Passed Ok to cover progress areas.
02/26/2025 BULD - Electrical Clearance Passed Passed 2/26/25 ready for temp power CLEARANCE ECO
04/16/2025 COT - RSPL - Sewer Passed 4-16-25, approximately 80' of Schedule 40-4" sewer line/connection verified under test and per plans-Okay to backfill.
04/17/2025 COT - RSEL - Grounding/Bonding Passed 4-17-25, approved.
04/17/2025 COT - RSEL - Electrical Underground Passed 4-17-25, previously inspected and approved.
04/17/2025 COT - RSEL - Outdoor Lighting Passed 4-17-25, approved.
04/17/2025 RSBU - Building Progress Passed 4-17-25, approved.
04/18/2025 COT - RSEL - Electrical Final Passed 4-18-25, mechanical, electrical, plumbing, outdoor lighting approved.
04/18/2025 COT - RSME - Mechanical Final Passed 4-18-25, mechanical, electrical, plumbing, outdoor lighting approved.
04/18/2025 COT - RSPL - Plumbing Final Passed 4-18-25, mechanical, electrical, plumbing, outdoor lighting approved.
04/21/2025 COT - RSBU - Interior Shear Bracing Passed 4/21/2025 letter has been uploaded and under review.
04/22/2025 RSBU - Building Final Passed
04/22/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TOP OF FORM ELEV CERT-2025-01-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW