Inspection Status: Partial Pass
Inspection History: COT - RSBU - Interior Shear Bracing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2025 |
COT - RSBU - Interior Shear Bracing |
|
Partial Pass |
2/7/25 we will need to see the gypsum board before taping. Partial |
| 04/17/2025 |
COT - RSBU - Interior Shear Bracing |
|
Re-inspection required |
4-17-25, based on the notes from previous inspection from 2-7-25, you must submit a letter to the city for review and approval. The letter must indicate that nailing was done per the approved plans and met all requirements outlined in the 2018 IRC. |
| 04/18/2025 |
COT - RSBU - Interior Shear Bracing |
|
Re-inspection required |
4-18-25, see previous notes. |
| 04/21/2025 |
COT - RSBU - Interior Shear Bracing |
|
Passed |
4/21/2025 letter has been uploaded and under review. |