Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
10422 E SILVER FOX DR
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0924-01041
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
10/03/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/07/2024 APPROVED Review Details
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01041
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
10/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/07/2024 Post-Tension Inspection Report is required.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01041
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/21/2025 COT - RSPL - Backwater Valve Passed 1/21/25 pass
01/21/2025 COT - RSPL - Rough Soil Passed 1/21/25 pass ok to backfill and shade.
01/21/2025 COT - RSPL - Sewer Passed 1/21/25 pass
01/21/2025 COT - RSPL - Yard Water Line Passed 1/21/25 pass
01/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
01/29/2025 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
01/29/2025 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
02/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Okay to proceed with top out and rough in.
02/14/2025 COT - RSBU - Roof Nailing Passed Okay to proceed with top out and rough in.
03/07/2025 BULD - Electrical Clearance Passed 3-7-25, okay to energize panel. ECO clearance issued to TEP.
03/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3-7-25, approved. Okay to continue with construction
03/07/2025 COT - RSEL - Grounding/Bonding Passed 3-7-25, approved.
03/07/2025 COT - RSPL - Gas Pressure Test Passed 3-7-25, gas pressure test approved.
03/21/2025 COT - RSBU - Interior Shear Bracing Passed 3-21-25, interior shear wall inspection approved. Okay for tape & texture
05/06/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 5/6/25
05/09/2025 COT - RSEL - Electrical Final Passed Passed final 5/9/25
05/09/2025 COT - RSEL - Outdoor Lighting Passed Passed final 5/9/25
05/09/2025 COT - RSME - Mechanical Final Passed Passed final 5/9/25
05/09/2025 COT - RSPL - Plumbing Final Passed Passed final 5/9/25
05/09/2025 ENGR Engineering Final Passed Site is in accordance with plans. CofO ready.
05/09/2025 RSBU - Building Final Passed Passed final 5/9/25
05/09/2025 RSBU - Building Progress Passed Passed final 5/9/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
153109 PT LOT 44 COMPLETE-2025-03-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 44 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 44 SPECIAL INSPECTION CERTIFICATE-2024-10-03_V1.PDF DOCUMENTS VIEW