Permit: TC-MDP-0924-01041
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10422 E SILVER FOX DR
Address NEW:
10422 E SILVER FOX DR
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0924-01041
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/07/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01041
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 10/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/07/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01041
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | COT - RSPL - Backwater Valve | Passed | 1/21/25 pass | |
| 01/21/2025 | COT - RSPL - Rough Soil | Passed | 1/21/25 pass ok to backfill and shade. | |
| 01/21/2025 | COT - RSPL - Sewer | Passed | 1/21/25 pass | |
| 01/21/2025 | COT - RSPL - Yard Water Line | Passed | 1/21/25 pass | |
| 01/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, shear wall braces are installed, masa clips are installed 32" on center, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 02/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with top out and rough in. | |
| 02/14/2025 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with top out and rough in. | |
| 03/07/2025 | BULD - Electrical Clearance | Passed | 3-7-25, okay to energize panel. ECO clearance issued to TEP. | |
| 03/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3-7-25, approved. Okay to continue with construction | |
| 03/07/2025 | COT - RSEL - Grounding/Bonding | Passed | 3-7-25, approved. | |
| 03/07/2025 | COT - RSPL - Gas Pressure Test | Passed | 3-7-25, gas pressure test approved. | |
| 03/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-21-25, interior shear wall inspection approved. Okay for tape & texture | |
| 05/06/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 5/6/25 | |
| 05/09/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/9/25 | |
| 05/09/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/9/25 | |
| 05/09/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/9/25 | |
| 05/09/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/9/25 | |
| 05/09/2025 | ENGR Engineering Final | Passed | Site is in accordance with plans. CofO ready. | |
| 05/09/2025 | RSBU - Building Final | Passed | Passed final 5/9/25 | |
| 05/09/2025 | RSBU - Building Progress | Passed | Passed final 5/9/25 |