Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/09/2023
Applicant:
Abraham Andraux
Description:
GRANDE DUPLEX MODEL PLAN SET

Permit Reviews

Permit Number - TC-MDP-0923-01566
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Start Date Submittal Complete Date Status  
03/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.4 03/12/2024 REQUIRES RESUBMIT Review Details
12/29/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.3 01/18/2024 REQUIRES RESUBMIT Review Details
06/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/07/2024 APPROVED Review Details
10/10/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/11/2023 REQUIRES RESUBMIT Review Details
03/13/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.5 03/21/2024 APPROVED Review Details
11/03/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 11/13/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01566
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Total Outstanding Activity Conditions - 2
Date Name
11/04/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
11/04/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0923-01566
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Date Description Comments
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01566
Permite Description: GRANDE DUPLEX MODEL PLAN SET
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/02/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/02/2025 COT - RSEL - Electrical Underground N/A Not Applicable
01/02/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01566
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/14/2024 COT - RSPL - Rough Soil Passed 5/14/24: plumbing underground per plans ok to proceed. Shading required
05/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/20/2024 COT - RSBU - Preslab and floodplain Passed 5/16/24: canceled per Carlos
5/20/24: reinforcement per plan ok to proceed.
06/07/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/07/2024 COT - RSBU - Roof Nailing Passed
12/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/02/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO units 1 and 2.
01/02/2025 COT - RSBU - Interior Shear Bracing Passed
01/02/2025 COT - RSEL - Grounding/Bonding Passed
04/14/2025 COT - RSPL - Backwater Valve Passed
04/14/2025 COT - RSPL - Sewer Passed 4/9/25: Canceled by Abraham
4/10/25: Sewer tap per plans and under pressure. Ok to backfill 30' run from sewer tap.
4/14/25: Sewer connection to home approved and under test. Ok to backfill. Shading required
04/14/2025 COT - RSPL - Yard Water Line Passed
04/14/2025 RSBU - Building Progress Passed
08/20/2025 COT - RSEL - Outdoor Lighting Passed 8-20-25: outdoor lighting approved.
09/26/2025 RSBU - Building Final Passed 9/26/25 corrections made
09/26/2025 ENGR Engineering Final Passed Site is safe and accessible, completed in accordance with approved plans.
09/26/2025 COT - RSPL - Plumbing Final Passed 9/26/25 corrections made
09/26/2025 COT - RSME - Mechanical Final Passed 9/26/25 corrections made
09/26/2025 COT - RSEL - Electrical Final Passed 9/26/25 corrections made

Documents

File Name Document Type  
1_TRUSS_CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SCAN_MVERDUG2_2024-03-28-15-04-08_V1.PDF DOCUMENTS VIEW
4558 S FREMONT AV REV_SITE_PLAN_V1.PDF DOCUMENTS VIEW
SPAPP-DDO_24_05_DECISION (1)-2024-03-01_V1.PDF DOCUMENTS VIEW
DDO_24_05_DECISION.PDF SPECIAL APPLICATIONS VIEW
DDO_24_05_APPLICATION.PDF DOCUMENTS VIEW
DDO_24_05_NOTICE.PDF DOCUMENTS VIEW
DDO_24_05_PLAN SET.PDF DOCUMENTS VIEW