Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
08/20/2025 RSBU - Building Final  Re-inspection required 8-20-25: write " non metallic plumbing " inside main panel, missing EV charger breaker, install elbow on all condensation lines, paint all exterior pvc/abs, cut all cleanouts located on east side to grade and install caps on those that are missing.
09/26/2025 RSBU - Building Final  Passed 9/26/25 corrections made